The Parking Spt Msp 2
AvailableEV charging station in Bloomington, Minnesota on the ChargePoint network — 2 Level 2. US DOE AFDC station 450364.
At a glance
The Parking Spt Msp 2 is a public EV charging station at 3750 American Boulevard East in Bloomington, Minnesota, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 29, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 450364 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 29, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 3750 American Boulevard East
- City
- Bloomington
- State
- Minnesota
- ZIP
- 55425
- Coordinates
- 44.85936, -93.21832
Within ~15 km
Nearby charging
Tesla Destination · Available
Tesla Supercharger · Available
- Inver Grove Ford14 ports
Blink · Available
Tesla Destination · Available
- Eagan, MN - Tesla Supercharger12 ports
Tesla Supercharger · Available
- Inver Grove Ford Lincoln12 ports
Non-networked · Planned
What kind of charging does The Parking Spt Msp 2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Minnesota average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does The Parking Spt Msp 2 compare with other stations in Bloomington?
Bloomington has 37 charging stations in the DOE registry with 122 ports, the 4th-most of 218 cities and towns in Minnesota. The Parking Spt Msp 2 accounts for 2% of the charging ports in Bloomington. ChargePoint runs 17 stations in Bloomington. Statewide, Minnesota has 1,226 stations and 3,485 ports, the 22nd-largest station count of the 51 states and DC. The biggest station in Minnesota, 3m in St. Paul, has 44 ports.
Who operates The Parking Spt Msp 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 534 of those stations are in Minnesota, 44% of the state's 1,226.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 29, 2026, one of 154 stations in Minnesota with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does The Parking Spt Msp 2 have?
The Parking Spt Msp 2 has 2 charging ports: 2 Level 2.
Does The Parking Spt Msp 2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does The Parking Spt Msp 2 have?
The Parking Spt Msp 2 has J1772 connectors.
Is The Parking Spt Msp 2 open to the public?
Yes. The Parking Spt Msp 2 is listed with public access, and its status is available.
Where is The Parking Spt Msp 2?
The Parking Spt Msp 2 is at 3750 American Boulevard East, Bloomington, MN 55425. Its coordinates are 44.85936, -93.21832.
More EV charging around Bloomington
Working with Minnesota charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 450364, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “The Parking Spt Msp 2, Bloomington, MN (AFDC station 450364)”, https://chargecensus.com/stations/minnesota/the-parking-spt-msp-2-450364 (data as of October 12, 2026).