ChargeCensus

St. Cloud Honda

Available

EV charging station in Waite Park, Minnesota on the Blink network — 1 DC fast · 1 Level 2. US DOE AFDC station 257154.

At a glance

St. Cloud Honda is a public EV charging station at 1500 Hwy 23 in Waite Park, Minnesota, on the Blink network. It has 2 charging ports (1 DC fast · 1 Level 2) with J1772 and CCS connectors. The US DOE registry lists it as available, open since Mar 27, 2023.

Total ports
2
DC fast
1
Level 2
1
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID257154
NetworkBlink
StatusAvailable (E)
AccessPublic
Open dateMar 27, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

Blink

Operates 6,186 stations in the DOE registry — view the full network →

Location

Address
1500 Hwy 23
City
Waite Park
ZIP
56387
Coordinates
45.54694, -94.23664

Within ~15 km

Nearby charging

What kind of charging does St. Cloud Honda offer?

Of its 2 ports, 1 is DC fast and 1 is Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Minnesota average of 2.8 ports per station. The registry lists 2 connector types: J1772, the standard Level 1/2 AC connector; CCS, Combined Charging System — the J1772-based DC fast connector.

How does St. Cloud Honda compare with other stations in Waite Park?

Waite Park has 3 charging stations in the DOE registry with 7 ports. St. Cloud Honda accounts for 29% of the charging ports in Waite Park. Blink runs 2 stations in Waite Park. Statewide, Minnesota has 1,226 stations and 3,485 ports, the 22nd-largest station count of the 51 states and DC. The biggest station in Minnesota, 3m in St. Paul, has 44 ports.

Who operates St. Cloud Honda?

Blink Charging's public network — largely Level 2. Blink operates 6,186 stations in the registry across 52 states, with 2,086 DC fast and 21,012 Level 2 ports in total. 97 of those stations are in Minnesota, 8% of the state's 1,226.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 27, 2023, one of 165 stations in Minnesota with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does St. Cloud Honda have?

St. Cloud Honda has 2 charging ports: 1 DC fast · 1 Level 2.

Does St. Cloud Honda have DC fast charging?

Yes. The registry lists 1 DC fast port at St. Cloud Honda, with CCS connectors.

What connectors does St. Cloud Honda have?

St. Cloud Honda has J1772 and CCS connectors.

Is St. Cloud Honda open to the public?

Yes. St. Cloud Honda is listed with public access, and its status is available.

Where is St. Cloud Honda?

St. Cloud Honda is at 1500 Hwy 23, Waite Park, MN 56387. Its coordinates are 45.54694, -94.23664.

More EV charging around Waite Park

Working with Minnesota charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 257154, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “St. Cloud Honda, Waite Park, MN (AFDC station 257154)”, https://chargecensus.com/stations/minnesota/st-cloud-honda-257154 (data as of October 12, 2026).