Lanesboro Bass Pond 01
AvailableEV charging station in Lanesboro, Minnesota on the ChargePoint network — 2 Level 2. US DOE AFDC station 98778.
At a glance
Lanesboro Bass Pond 01 is a public EV charging station at Co Hwy 21 in Lanesboro, Minnesota, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 8, 2018.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 98778 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 8, 2018 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- Co Hwy 21
- City
- Lanesboro
- State
- Minnesota
- ZIP
- 55949
- Coordinates
- 43.72051, -91.97908
Within ~15 km
Nearby charging
ZEF Energy · Available
- City of Preston2 ports
ZEF Energy · Available
- North Preston2 ports
ZEF Energy · Available
- Lanesboro Bass Pond 022 ports
ChargePoint · Available
What kind of charging does Lanesboro Bass Pond 01 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Minnesota average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Lanesboro Bass Pond 01 compare with other stations in Lanesboro?
Lanesboro has 2 charging stations in the DOE registry with 4 ports. Lanesboro Bass Pond 01 accounts for 50% of the charging ports in Lanesboro. ChargePoint runs 2 stations in Lanesboro. Statewide, Minnesota has 1,226 stations and 3,485 ports, the 22nd-largest station count of the 51 states and DC. The biggest station in Minnesota, 3m in St. Paul, has 44 ports.
Who operates Lanesboro Bass Pond 01?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 534 of those stations are in Minnesota, 44% of the state's 1,226.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 8, 2018, one of 33 stations in Minnesota with a 2018 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Lanesboro Bass Pond 01 have?
Lanesboro Bass Pond 01 has 2 charging ports: 2 Level 2.
Does Lanesboro Bass Pond 01 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Lanesboro Bass Pond 01 have?
Lanesboro Bass Pond 01 has J1772 connectors.
Is Lanesboro Bass Pond 01 open to the public?
Yes. Lanesboro Bass Pond 01 is listed with public access, and its status is available.
Where is Lanesboro Bass Pond 01?
Lanesboro Bass Pond 01 is at Co Hwy 21, Lanesboro, MN 55949. Its coordinates are 43.72051, -91.97908.
More EV charging around Lanesboro
Working with Minnesota charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 98778, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Lanesboro Bass Pond 01, Lanesboro, MN (AFDC station 98778)”, https://chargecensus.com/stations/minnesota/lanesboro-bass-pond-01-98778 (data as of October 12, 2026).