Hallock
AvailableEV charging station in Hallock, Minnesota on the ChargeLab network — 2 DC fast · 2 Level 2. US DOE AFDC station 455622.
At a glance
Hallock is a public EV charging station at 702 N Atlantic Ave in Hallock, Minnesota, on the ChargeLab network. It has 4 charging ports (2 DC fast · 2 Level 2) with CHAdeMO, J1772 and CCS connectors. The US DOE registry lists it as available, open since Mar 18, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 455622 |
| Network | ChargeLab |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 18, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- J1772 — The standard Level 1/2 AC connector.
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 702 N Atlantic Ave
- City
- Hallock
- State
- Minnesota
- ZIP
- 56728
- Coordinates
- 48.78292, -96.95085
Within ~15 km
Nearby charging
- C & M Ford1 ports
Non-networked · Available
What kind of charging does Hallock offer?
Of its 4 ports, 2 are DC fast and 2 are Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 41% above the Minnesota average of 2.8 ports per station. The registry lists 3 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); J1772, the standard Level 1/2 AC connector; CCS, Combined Charging System — the J1772-based DC fast connector.
How does Hallock compare with other stations in Hallock?
Hallock has 2 charging stations in the DOE registry with 5 ports. Hallock accounts for 80% of the charging ports in Hallock. It is the only ChargeLab station in Hallock. Statewide, Minnesota has 1,226 stations and 3,485 ports, the 22nd-largest station count of the 51 states and DC. The biggest station in Minnesota, 3m in St. Paul, has 44 ports.
Who operates Hallock?
ChargeLab operates 406 stations in the registry across 38 states, with 325 DC fast and 1,312 Level 2 ports in total. 14 of those stations are in Minnesota, 1% of the state's 1,226.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 18, 2026, one of 154 stations in Minnesota with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Hallock have?
Hallock has 4 charging ports: 2 DC fast · 2 Level 2.
Does Hallock have DC fast charging?
Yes. The registry lists 2 DC fast ports at Hallock, with CHAdeMO and CCS connectors.
What connectors does Hallock have?
Hallock has CHAdeMO, J1772 and CCS connectors.
Is Hallock open to the public?
Yes. Hallock is listed with public access, and its status is available.
Where is Hallock?
Hallock is at 702 N Atlantic Ave, Hallock, MN 56728. Its coordinates are 48.78292, -96.95085.
More EV charging around Hallock
Working with Minnesota charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 455622, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Hallock, Hallock, MN (AFDC station 455622)”, https://chargecensus.com/stations/minnesota/hallock-455622 (data as of October 12, 2026).