Dakota County Adc 01
AvailableEV charging station in Hastings, Minnesota on the ChargePoint network — 2 Level 2. US DOE AFDC station 374796.
At a glance
Dakota County Adc 01 is a public EV charging station at 1560 Highway 55 in Hastings, Minnesota, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 2, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 374796 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 2, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1560 Highway 55
- City
- Hastings
- State
- Minnesota
- ZIP
- 55033
- Coordinates
- 44.74034, -92.88775
Within ~15 km
Nearby charging
IONNA · Available
- Pilot Travel Center4 ports
EVgo · Available
- Lake Isabelle Flats2 ports
Blink · Available
- Confluence EV Station 12 ports
ChargePoint · Available
- Dakota County Spring Lake 012 ports
ChargePoint · Available
- Dakota County Adc 022 ports
ChargePoint · Available
What kind of charging does Dakota County Adc 01 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Minnesota average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Dakota County Adc 01 compare with other stations in Hastings?
Hastings has 9 charging stations in the DOE registry with 21 ports. Dakota County Adc 01 accounts for 10% of the charging ports in Hastings. ChargePoint runs 6 stations in Hastings. Statewide, Minnesota has 1,226 stations and 3,485 ports, the 22nd-largest station count of the 51 states and DC. The biggest station in Minnesota, 3m in St. Paul, has 44 ports.
Who operates Dakota County Adc 01?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 534 of those stations are in Minnesota, 44% of the state's 1,226.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 2, 2025, one of 220 stations in Minnesota with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Dakota County Adc 01 have?
Dakota County Adc 01 has 2 charging ports: 2 Level 2.
Does Dakota County Adc 01 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Dakota County Adc 01 have?
Dakota County Adc 01 has J1772 connectors.
Is Dakota County Adc 01 open to the public?
Yes. Dakota County Adc 01 is listed with public access, and its status is available.
Where is Dakota County Adc 01?
Dakota County Adc 01 is at 1560 Highway 55, Hastings, MN 55033. Its coordinates are 44.74034, -92.88775.
More EV charging around Hastings
Working with Minnesota charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 374796, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Dakota County Adc 01, Hastings, MN (AFDC station 374796)”, https://chargecensus.com/stations/minnesota/dakota-county-adc-01-374796 (data as of October 12, 2026).