ChargeCensus

Crow River Winery

Available

EV charging station in Hutchinson, Minnesota on the Red E network — 2 DC fast. US DOE AFDC station 462279.

At a glance

Crow River Winery is a public EV charging station at 14848 MN 7 in Hutchinson, Minnesota, on the Red E network. It has 2 charging ports (2 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Jun 26, 2026.

Total ports
2
DC fast
2
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 4 nearby

Station record

DOE registry record

FieldValue
AFDC station ID462279
NetworkRed E
StatusAvailable (E)
AccessPublic
FacilityPublic site
Open dateJun 26, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

Red E

Operates 1,105 stations in the DOE registry — view the full network →

Location

Address
14848 MN 7
City
Hutchinson
ZIP
55350
Coordinates
44.89279, -94.29257

Within ~15 km

Nearby charging

What kind of charging does Crow River Winery offer?

Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 30% below the Minnesota average of 2.8 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector. The site is listed as a public site location.

How does Crow River Winery compare with other stations in Hutchinson?

Hutchinson has 4 charging stations in the DOE registry with 6 ports. Crow River Winery accounts for 33% of the charging ports in Hutchinson. It is the only Red E station in Hutchinson. Statewide, Minnesota has 1,226 stations and 3,485 ports, the 22nd-largest station count of the 51 states and DC. The biggest station in Minnesota, 3m in St. Paul, has 44 ports.

Who operates Crow River Winery?

Red E operates 1,105 stations in the registry across 47 states, with 2,240 DC fast and 2,633 Level 2 ports in total. 13 of those stations are in Minnesota, 1% of the state's 1,226.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 26, 2026, one of 154 stations in Minnesota with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Crow River Winery have?

Crow River Winery has 2 charging ports: 2 DC fast.

Does Crow River Winery have DC fast charging?

Yes. The registry lists 2 DC fast ports at Crow River Winery, with CCS connectors.

What connectors does Crow River Winery have?

Crow River Winery has CCS connectors.

Is Crow River Winery open to the public?

Yes. Crow River Winery is listed with public access, and its status is available.

Where is Crow River Winery?

Crow River Winery is at 14848 MN 7, Hutchinson, MN 55350. Its coordinates are 44.89279, -94.29257.

More EV charging around Hutchinson

Working with Minnesota charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 462279, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Crow River Winery, Hutchinson, MN (AFDC station 462279)”, https://chargecensus.com/stations/minnesota/crow-river-winery-462279 (data as of October 12, 2026).