ChargeCensus

City Of St Paul River Centre 3

Available

EV charging station in Saint Paul, Minnesota on the ChargePoint network — 2 Level 2. US DOE AFDC station 174088.

At a glance

City Of St Paul River Centre 3 is a public EV charging station at 150 W Kellogg Blvd in Saint Paul, Minnesota, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID174088
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJan 27, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
150 W Kellogg Blvd
ZIP
55102
Coordinates
44.94317, -93.10027

Within ~15 km

Nearby charging

What kind of charging does City Of St Paul River Centre 3 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Minnesota average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does City Of St Paul River Centre 3 compare with other stations in Saint Paul?

Saint Paul has 98 charging stations in the DOE registry with 186 ports, the 2nd-most of 218 cities and towns in Minnesota. City Of St Paul River Centre 3 accounts for 1% of the charging ports in Saint Paul. ChargePoint runs 55 stations in Saint Paul. Statewide, Minnesota has 1,226 stations and 3,485 ports, the 22nd-largest station count of the 51 states and DC. The biggest station in Minnesota, 3m in St. Paul, has 44 ports.

Who operates City Of St Paul River Centre 3?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 534 of those stations are in Minnesota, 44% of the state's 1,226.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 121 stations in Minnesota with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does City Of St Paul River Centre 3 have?

City Of St Paul River Centre 3 has 2 charging ports: 2 Level 2.

Does City Of St Paul River Centre 3 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does City Of St Paul River Centre 3 have?

City Of St Paul River Centre 3 has J1772 connectors.

Is City Of St Paul River Centre 3 open to the public?

Yes. City Of St Paul River Centre 3 is listed with public access, and its status is available.

Where is City Of St Paul River Centre 3?

City Of St Paul River Centre 3 is at 150 W Kellogg Blvd, Saint Paul, MN 55102. Its coordinates are 44.94317, -93.10027.

More EV charging around Saint Paul

Working with Minnesota charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 174088, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “City Of St Paul River Centre 3, Saint Paul, MN (AFDC station 174088)”, https://chargecensus.com/stations/minnesota/city-of-st-paul-river-centre-3-174088 (data as of October 12, 2026).