Chev Wayzata Station 1
AvailableEV charging station in Wayzata, Minnesota on the ChargePoint network — 2 Level 2. US DOE AFDC station 306354.
At a glance
Chev Wayzata Station 1 is a public EV charging station at 16200 Wayzata Boulevard in Wayzata, Minnesota, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 4, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 306354 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 4, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
Within ~15 km
Nearby charging
Tesla Destination · Available
Tesla Supercharger · Available
- Maple Grove, MN12 ports
Rivian Adventure Network · Available
- Audi Minneapolis11 ports
Blink · Available
- AC Marriott10 ports
Non-networked · Available
Tesla Supercharger · Available
What kind of charging does Chev Wayzata Station 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Minnesota average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Chev Wayzata Station 1 compare with other stations in Wayzata?
Wayzata has 11 charging stations in the DOE registry with 18 ports, the 24th-most of 218 cities and towns in Minnesota. Chev Wayzata Station 1 accounts for 11% of the charging ports in Wayzata. ChargePoint runs 8 stations in Wayzata. Statewide, Minnesota has 1,226 stations and 3,485 ports, the 22nd-largest station count of the 51 states and DC. The biggest station in Minnesota, 3m in St. Paul, has 44 ports.
Who operates Chev Wayzata Station 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 534 of those stations are in Minnesota, 44% of the state's 1,226.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 4, 2023, one of 165 stations in Minnesota with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Chev Wayzata Station 1 have?
Chev Wayzata Station 1 has 2 charging ports: 2 Level 2.
Does Chev Wayzata Station 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Chev Wayzata Station 1 have?
Chev Wayzata Station 1 has J1772 connectors.
Is Chev Wayzata Station 1 open to the public?
Yes. Chev Wayzata Station 1 is listed with public access, and its status is available.
Where is Chev Wayzata Station 1?
Chev Wayzata Station 1 is at 16200 Wayzata Boulevard, Wayzata, MN 55391. Its coordinates are 44.97184, -93.48483.
More EV charging around Wayzata
Working with Minnesota charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 306354, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Chev Wayzata Station 1, Wayzata, MN (AFDC station 306354)”, https://chargecensus.com/stations/minnesota/chev-wayzata-station-1-306354 (data as of October 12, 2026).