Battle Lake
AvailableEV charging station in Battle Lake, Minnesota on the ChargeLab network — 2 DC fast · 1 Level 2. US DOE AFDC station 455610.
At a glance
Battle Lake is a public EV charging station at 102 Gilbertson St W in Battle Lake, Minnesota, on the ChargeLab network. It has 3 charging ports (2 DC fast · 1 Level 2) with CHAdeMO, J1772 and CCS connectors. The US DOE registry lists it as available, open since Mar 18, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 455610 |
| Network | ChargeLab |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 18, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
- J1772 — The standard Level 1/2 AC connector.
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 102 Gilbertson St W
- City
- Battle Lake
- State
- Minnesota
- ZIP
- 56515
- Coordinates
- 46.27995, -95.71512
Within ~15 km
Nearby charging
No other registered stations within ~15 km.
What kind of charging does Battle Lake offer?
Of its 3 ports, 2 are DC fast and 1 is Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is roughly in line with the Minnesota average of 2.8 ports per station. The registry lists 3 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); J1772, the standard Level 1/2 AC connector; CCS, Combined Charging System — the J1772-based DC fast connector.
How does Battle Lake compare with other stations in Battle Lake?
Battle Lake has 1 charging station in the DOE registry with 3 ports. It is the only ChargeLab station in Battle Lake. Statewide, Minnesota has 1,226 stations and 3,485 ports, the 22nd-largest station count of the 51 states and DC. The biggest station in Minnesota, 3m in St. Paul, has 44 ports.
Who operates Battle Lake?
ChargeLab operates 406 stations in the registry across 38 states, with 325 DC fast and 1,312 Level 2 ports in total. 14 of those stations are in Minnesota, 1% of the state's 1,226.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 18, 2026, one of 154 stations in Minnesota with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Battle Lake have?
Battle Lake has 3 charging ports: 2 DC fast · 1 Level 2.
Does Battle Lake have DC fast charging?
Yes. The registry lists 2 DC fast ports at Battle Lake, with CHAdeMO and CCS connectors.
What connectors does Battle Lake have?
Battle Lake has CHAdeMO, J1772 and CCS connectors.
Is Battle Lake open to the public?
Yes. Battle Lake is listed with public access, and its status is available.
Where is Battle Lake?
Battle Lake is at 102 Gilbertson St W, Battle Lake, MN 56515. Its coordinates are 46.27995, -95.71512.
More EV charging around Battle Lake
Working with Minnesota charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 455610, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Battle Lake, Battle Lake, MN (AFDC station 455610)”, https://chargecensus.com/stations/minnesota/battle-lake-455610 (data as of October 12, 2026).