ChargeCensus

Austin Ford Jeep

Available

EV charging station in Austin, Minnesota on the Red E network — 4 DC fast · 4 Level 2. US DOE AFDC station 351681.

At a glance

Austin Ford Jeep is a public EV charging station at 2701 Oakland Ave W in Austin, Minnesota, on the Red E network. It has 8 charging ports (4 DC fast · 4 Level 2) with J1772 and CCS connectors. The US DOE registry lists it as available, open since Jul 10, 2024.

Total ports
8
DC fast
4
Level 2
4
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID351681
NetworkRed E
StatusAvailable (E)
AccessPublic
FacilityPublic site
Open dateJul 10, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

Red E

Operates 1,105 stations in the DOE registry — view the full network →

Location

Address
2701 Oakland Ave W
City
Austin
ZIP
55912
Coordinates
43.66627, -93.01254

Within ~15 km

Nearby charging

What kind of charging does Austin Ford Jeep offer?

Of its 8 ports, 4 are DC fast and 4 are Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 2.8 times the Minnesota average of 2.8 ports per station. The registry lists 2 connector types: J1772, the standard Level 1/2 AC connector; CCS, Combined Charging System — the J1772-based DC fast connector. The site is listed as a public site location.

How does Austin Ford Jeep compare with other stations in Austin?

Austin has 14 charging stations in the DOE registry with 33 ports, the 19th-most of 218 cities and towns in Minnesota. Austin Ford Jeep accounts for 24% of the charging ports in Austin. It is the only Red E station in Austin. Statewide, Minnesota has 1,226 stations and 3,485 ports, the 22nd-largest station count of the 51 states and DC. The biggest station in Minnesota, 3m in St. Paul, has 44 ports.

Who operates Austin Ford Jeep?

Red E operates 1,105 stations in the registry across 47 states, with 2,240 DC fast and 2,633 Level 2 ports in total. 13 of those stations are in Minnesota, 1% of the state's 1,226.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 10, 2024, one of 219 stations in Minnesota with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Austin Ford Jeep have?

Austin Ford Jeep has 8 charging ports: 4 DC fast · 4 Level 2.

Does Austin Ford Jeep have DC fast charging?

Yes. The registry lists 4 DC fast ports at Austin Ford Jeep, with CCS connectors.

What connectors does Austin Ford Jeep have?

Austin Ford Jeep has J1772 and CCS connectors.

Is Austin Ford Jeep open to the public?

Yes. Austin Ford Jeep is listed with public access, and its status is available.

Where is Austin Ford Jeep?

Austin Ford Jeep is at 2701 Oakland Ave W, Austin, MN 55912. Its coordinates are 43.66627, -93.01254.

More EV charging around Austin

Working with Minnesota charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 351681, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Austin Ford Jeep, Austin, MN (AFDC station 351681)”, https://chargecensus.com/stations/minnesota/austin-ford-jeep-351681 (data as of October 12, 2026).