ChargeCensus

Atwater Ford

Available

EV charging station in Atwater, Minnesota on the Ford Charge network — 2 DC fast. US DOE AFDC station 358381.

At a glance

Atwater Ford is a public EV charging station at 507 Pleasant Ave in Atwater, Minnesota, on the Ford Charge network. It has 2 charging ports (2 DC fast) with CCS connectors. The US DOE registry lists it as available, open since Jun 26, 2024.

Total ports
2
DC fast
2
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
Location

Station record

DOE registry record

FieldValue
AFDC station ID358381
NetworkFord Charge
StatusAvailable (E)
AccessPublic
FacilityPublic site
Open dateJun 26, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

Ford Charge

Operates 357 stations in the DOE registry — view the full network →

Location

Address
507 Pleasant Ave
City
Atwater
ZIP
56209
Coordinates
45.13868, -94.78373

Within ~15 km

Nearby charging

No other registered stations within ~15 km.

What kind of charging does Atwater Ford offer?

Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 30% below the Minnesota average of 2.8 ports per station. The registry lists one connector type: CCS, Combined Charging System — the J1772-based DC fast connector. The site is listed as a public site location.

How does Atwater Ford compare with other stations in Atwater?

Atwater has 1 charging station in the DOE registry with 2 ports. It is the only Ford Charge station in Atwater. Statewide, Minnesota has 1,226 stations and 3,485 ports, the 22nd-largest station count of the 51 states and DC. The biggest station in Minnesota, 3m in St. Paul, has 44 ports.

Who operates Atwater Ford?

Ford Charge operates 357 stations in the registry across 46 states, with 1,288 DC fast and 2 Level 2 ports in total. 13 of those stations are in Minnesota, 1% of the state's 1,226.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 26, 2024, one of 219 stations in Minnesota with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Atwater Ford have?

Atwater Ford has 2 charging ports: 2 DC fast.

Does Atwater Ford have DC fast charging?

Yes. The registry lists 2 DC fast ports at Atwater Ford, with CCS connectors.

What connectors does Atwater Ford have?

Atwater Ford has CCS connectors.

Is Atwater Ford open to the public?

Yes. Atwater Ford is listed with public access, and its status is available.

Where is Atwater Ford?

Atwater Ford is at 507 Pleasant Ave, Atwater, MN 56209. Its coordinates are 45.13868, -94.78373.

More EV charging around Atwater

Working with Minnesota charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 358381, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Atwater Ford, Atwater, MN (AFDC station 358381)”, https://chargecensus.com/stations/minnesota/atwater-ford-358381 (data as of October 12, 2026).