Walled Lake Walled Lake El
AvailableEV charging station in Walled Lake, Michigan on the ChargePoint network — 2 Level 2. US DOE AFDC station 203282.
At a glance
Walled Lake Walled Lake El is a public EV charging station at 1055 W West Maple Rd in Walled Lake, Michigan, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 30, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 203282 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 30, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1055 W West Maple Rd
- City
- Walled Lake
- State
- Michigan
- ZIP
- 48390
- Coordinates
- 42.53216, -83.49287
Within ~15 km
Nearby charging
- Plymouth, MI12 ports
Rivian Adventure Network · Available
Tesla Supercharger · Available
- Sakura Novi Residential10 ports
Red E · Available
- Serra Ford Farmington Hills10 ports
Red E · Available
- Cadillac of Novi8 ports
Red E · Available
Non-networked · Available
What kind of charging does Walled Lake Walled Lake El offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Michigan average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Walled Lake Walled Lake El compare with other stations in Walled Lake?
Walled Lake has 3 charging stations in the DOE registry with 5 ports. Walled Lake Walled Lake El accounts for 40% of the charging ports in Walled Lake. ChargePoint runs 2 stations in Walled Lake. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.
Who operates Walled Lake Walled Lake El?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,008 of those stations are in Michigan, 45% of the state's 2,228.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 30, 2021, one of 243 stations in Michigan with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Walled Lake Walled Lake El have?
Walled Lake Walled Lake El has 2 charging ports: 2 Level 2.
Does Walled Lake Walled Lake El have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Walled Lake Walled Lake El have?
Walled Lake Walled Lake El has J1772 connectors.
Is Walled Lake Walled Lake El open to the public?
Yes. Walled Lake Walled Lake El is listed with public access, and its status is available.
Where is Walled Lake Walled Lake El?
Walled Lake Walled Lake El is at 1055 W West Maple Rd, Walled Lake, MI 48390. Its coordinates are 42.53216, -83.49287.
More EV charging around Walled Lake
Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 203282, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Walled Lake Walled Lake El, Walled Lake, MI (AFDC station 203282)”, https://chargecensus.com/stations/michigan/walled-lake-walled-lake-el-203282 (data as of October 12, 2026).