Walled Lake Central
AvailableEV charging station in Commerce Charter Township, Michigan on the ChargePoint network — 2 Level 2. US DOE AFDC station 354039.
At a glance
Walled Lake Central is a public EV charging station at 1600 Oakley Park Rd in Commerce Charter Township, Michigan, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 28, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 354039 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 28, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1600 Oakley Park Rd
- City
- Commerce Charter Township
- State
- Michigan
- ZIP
- 48390
- Coordinates
- 42.56925, -83.47221
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Sakura Novi Residential10 ports
Red E · Available
- Serra Ford Farmington Hills10 ports
Red E · Available
- Cadillac of Novi8 ports
Red E · Available
Non-networked · Available
- Hines Park Ford7 ports
Red E · Available
What kind of charging does Walled Lake Central offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Michigan average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Walled Lake Central compare with other stations in Commerce Charter Township?
Commerce Charter Township has 5 charging stations in the DOE registry with 10 ports. Walled Lake Central accounts for 20% of the charging ports in Commerce Charter Township. ChargePoint runs 5 stations in Commerce Charter Township. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.
Who operates Walled Lake Central?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,008 of those stations are in Michigan, 45% of the state's 2,228.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 28, 2024, one of 397 stations in Michigan with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Walled Lake Central have?
Walled Lake Central has 2 charging ports: 2 Level 2.
Does Walled Lake Central have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Walled Lake Central have?
Walled Lake Central has J1772 connectors.
Is Walled Lake Central open to the public?
Yes. Walled Lake Central is listed with public access, and its status is available.
Where is Walled Lake Central?
Walled Lake Central is at 1600 Oakley Park Rd, Commerce Charter Township, MI 48390. Its coordinates are 42.56925, -83.47221.
More EV charging around Commerce Charter Township
Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 354039, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Walled Lake Central, Commerce Charter Township, MI (AFDC station 354039)”, https://chargecensus.com/stations/michigan/walled-lake-central-354039 (data as of October 12, 2026).