Villange North Charge 1
AvailableEV charging station in Gladwin, Michigan on the ChargePoint network — 2 Level 2. US DOE AFDC station 447405.
At a glance
Villange North Charge 1 is a public EV charging station at 561 Clendening Road in Gladwin, Michigan, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 13, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 447405 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Dec 13, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 561 Clendening Road
- City
- Gladwin
- State
- Michigan
- ZIP
- 48624
- Coordinates
- 43.99419, -84.49813
Within ~15 km
Nearby charging
- Gladwin City Hall4 ports
Red E · Available
What kind of charging does Villange North Charge 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Michigan average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Villange North Charge 1 compare with other stations in Gladwin?
Gladwin has 2 charging stations in the DOE registry with 6 ports. Villange North Charge 1 accounts for 33% of the charging ports in Gladwin. It is the only ChargePoint station in Gladwin. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.
Who operates Villange North Charge 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,008 of those stations are in Michigan, 45% of the state's 2,228.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 13, 2025, one of 417 stations in Michigan with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Villange North Charge 1 have?
Villange North Charge 1 has 2 charging ports: 2 Level 2.
Does Villange North Charge 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Villange North Charge 1 have?
Villange North Charge 1 has J1772 connectors.
Is Villange North Charge 1 open to the public?
Yes. Villange North Charge 1 is listed with public access, and its status is available.
Where is Villange North Charge 1?
Villange North Charge 1 is at 561 Clendening Road, Gladwin, MI 48624. Its coordinates are 43.99419, -84.49813.
More EV charging around Gladwin
Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 447405, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Villange North Charge 1, Gladwin, MI (AFDC station 447405)”, https://chargecensus.com/stations/michigan/villange-north-charge-1-447405 (data as of October 12, 2026).