Toc-Pkd Teamone-Cp-001
AvailableEV charging station in Charlotte, Michigan on the ChargePoint network — 2 Level 2. US DOE AFDC station 397054.
At a glance
Toc-Pkd Teamone-Cp-001 is a public EV charging station at 1616 Lansing Road in Charlotte, Michigan, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 28, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 397054 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | May 28, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1616 Lansing Road
- City
- Charlotte
- State
- Michigan
- ZIP
- 48813
- Coordinates
- 42.58222, -84.80548
Within ~15 km
Nearby charging
- LG ESMI Lansing10 ports
Blink · Available
EV Connect · Available
- Courthouse Public Parking4 ports
EV Connect · Available
- Team One Chevrolet4 ports
Non-networked · Available
- Cclcharger One2 ports
ChargePoint · Available
- Team One Chevrolet1 ports
Non-networked · Available
What kind of charging does Toc-Pkd Teamone-Cp-001 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Michigan average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Toc-Pkd Teamone-Cp-001 compare with other stations in Charlotte?
Charlotte has 7 charging stations in the DOE registry with 18 ports. Toc-Pkd Teamone-Cp-001 accounts for 11% of the charging ports in Charlotte. ChargePoint runs 2 stations in Charlotte. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.
Who operates Toc-Pkd Teamone-Cp-001?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,008 of those stations are in Michigan, 45% of the state's 2,228.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 28, 2025, one of 417 stations in Michigan with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Toc-Pkd Teamone-Cp-001 have?
Toc-Pkd Teamone-Cp-001 has 2 charging ports: 2 Level 2.
Does Toc-Pkd Teamone-Cp-001 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Toc-Pkd Teamone-Cp-001 have?
Toc-Pkd Teamone-Cp-001 has J1772 connectors.
Is Toc-Pkd Teamone-Cp-001 open to the public?
Yes. Toc-Pkd Teamone-Cp-001 is listed with public access, and its status is available.
Where is Toc-Pkd Teamone-Cp-001?
Toc-Pkd Teamone-Cp-001 is at 1616 Lansing Road, Charlotte, MI 48813. Its coordinates are 42.58222, -84.80548.
More EV charging around Charlotte
Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 397054, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Toc-Pkd Teamone-Cp-001, Charlotte, MI (AFDC station 397054)”, https://chargecensus.com/stations/michigan/toc-pkd-teamone-cp-001-397054 (data as of October 12, 2026).