ChargeCensus

Rochester Lot 6 Parking 1

Available

EV charging station in Rochester, Michigan on the ChargePoint network — 2 Level 2. US DOE AFDC station 254278.

At a glance

Rochester Lot 6 Parking 1 is a public EV charging station at 222 S Main St in Rochester, Michigan, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 20, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID254278
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateFeb 20, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
222 S Main St
City
Rochester
ZIP
48307
Coordinates
42.67885, -83.13269

Within ~15 km

Nearby charging

What kind of charging does Rochester Lot 6 Parking 1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Michigan average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Rochester Lot 6 Parking 1 compare with other stations in Rochester?

Rochester has 2 charging stations in the DOE registry with 4 ports. Rochester Lot 6 Parking 1 accounts for 50% of the charging ports in Rochester. ChargePoint runs 2 stations in Rochester. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.

Who operates Rochester Lot 6 Parking 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,008 of those stations are in Michigan, 45% of the state's 2,228.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 20, 2023, one of 309 stations in Michigan with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Rochester Lot 6 Parking 1 have?

Rochester Lot 6 Parking 1 has 2 charging ports: 2 Level 2.

Does Rochester Lot 6 Parking 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Rochester Lot 6 Parking 1 have?

Rochester Lot 6 Parking 1 has J1772 connectors.

Is Rochester Lot 6 Parking 1 open to the public?

Yes. Rochester Lot 6 Parking 1 is listed with public access, and its status is available.

Where is Rochester Lot 6 Parking 1?

Rochester Lot 6 Parking 1 is at 222 S Main St, Rochester, MI 48307. Its coordinates are 42.67885, -83.13269.

More EV charging around Rochester

Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 254278, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Rochester Lot 6 Parking 1, Rochester, MI (AFDC station 254278)”, https://chargecensus.com/stations/michigan/rochester-lot-6-parking-1-254278 (data as of October 12, 2026).