Richardson Midland
AvailableEV charging station in Midland, Michigan on the EV Connect network — 2 DC fast · 1 Level 2. US DOE AFDC station 352475.
At a glance
Richardson Midland is a public EV charging station at 2400 N Saginaw Rd in Midland, Michigan, on the EV Connect network. It has 3 charging ports (2 DC fast · 1 Level 2) with J1772 and CCS connectors. The US DOE registry lists it as available, open since Aug 13, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 352475 |
| Network | EV Connect |
| Status | Available (E) |
| Access | Public |
| Open date | Aug 13, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
- CCS — Combined Charging System — the J1772-based DC fast connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
- Midland8 ports
Shell Recharge · Available
- Midland Ford Lincoln6 ports
Red E · Available
- Burt Watson Chevrolet3 ports
Non-networked · Available
- Pats Food Freeland2 ports
Red E · Available
- Cork ’N’ Ale2 ports
Non-networked · Available
- East End Building2 ports
Non-networked · Available
What kind of charging does Richardson Midland offer?
Of its 3 ports, 2 are DC fast and 1 is Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is roughly in line with the Michigan average of 2.8 ports per station. The registry lists 2 connector types: J1772, the standard Level 1/2 AC connector; CCS, Combined Charging System — the J1772-based DC fast connector.
How does Richardson Midland compare with other stations in Midland?
Midland has 11 charging stations in the DOE registry with 30 ports. Richardson Midland accounts for 10% of the charging ports in Midland. It is the only EV Connect station in Midland. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.
Who operates Richardson Midland?
EV Connect operates 1,601 stations in the registry across 50 states, with 1,835 DC fast and 3,902 Level 2 ports in total. 49 of those stations are in Michigan, 2% of the state's 2,228.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 13, 2024, one of 397 stations in Michigan with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Richardson Midland have?
Richardson Midland has 3 charging ports: 2 DC fast · 1 Level 2.
Does Richardson Midland have DC fast charging?
Yes. The registry lists 2 DC fast ports at Richardson Midland, with CCS connectors.
What connectors does Richardson Midland have?
Richardson Midland has J1772 and CCS connectors.
Is Richardson Midland open to the public?
Yes. Richardson Midland is listed with public access, and its status is available.
Where is Richardson Midland?
Richardson Midland is at 2400 N Saginaw Rd, Midland, MI 48640. Its coordinates are 43.64178, -84.25595.
More EV charging around Midland
Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 352475, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Richardson Midland, Midland, MI (AFDC station 352475)”, https://chargecensus.com/stations/michigan/richardson-midland-352475 (data as of October 12, 2026).