Perfecting Church
AvailableEV charging station in Detroit, Michigan on the Red E network — 4 Level 2. US DOE AFDC station 400440.
At a glance
Perfecting Church is a public EV charging station at 7616 Nevada Avenue in Detroit, Michigan, on the Red E network. It has 4 charging ports (4 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 30, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 400440 |
| Network | Red E |
| Status | Available (E) |
| Access | Public |
| Facility | Public site |
| Open date | Dec 30, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
- Brush Watson Apartments79 ports
Red E · Available
- Bagley Mobility Hub32 ports
Red E · Available
- Detroit, MI - Tesla Supercharger20 ports
Tesla Supercharger · Available
- Mc320 ports
Red E · Available
- Meijer Warren #23712 ports
EVgo · Available
- Forum Flats Apartments12 ports
Red E · Available
What kind of charging does Perfecting Church offer?
Of its 4 ports, 4 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 41% above the Michigan average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a public site location.
How does Perfecting Church compare with other stations in Detroit?
Detroit has 273 charging stations in the DOE registry with 832 ports, the most of 355 cities and towns in Michigan. Perfecting Church accounts for under 1% of the charging ports in Detroit. Red E runs 59 stations in Detroit. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.
Who operates Perfecting Church?
Red E operates 1,105 stations in the registry across 47 states, with 2,240 DC fast and 2,633 Level 2 ports in total. 442 of those stations are in Michigan, 20% of the state's 2,228.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 30, 2024, one of 397 stations in Michigan with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Perfecting Church have?
Perfecting Church has 4 charging ports: 4 Level 2.
Does Perfecting Church have DC fast charging?
No. The registry lists no DC fast ports here; its 4 ports are all Level 2.
What connectors does Perfecting Church have?
Perfecting Church has J1772 connectors.
Is Perfecting Church open to the public?
Yes. Perfecting Church is listed with public access, and its status is available.
Where is Perfecting Church?
Perfecting Church is at 7616 Nevada Avenue, Detroit, MI 48234. Its coordinates are 42.42715, -83.02578.
More EV charging around Detroit
Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 400440, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Perfecting Church, Detroit, MI (AFDC station 400440)”, https://chargecensus.com/stations/michigan/perfecting-church-400440 (data as of October 12, 2026).