ChargeCensus

Parking Lot #4 Station 01

Available

EV charging station in Hart, Michigan on the ChargePoint network — 2 Level 2. US DOE AFDC station 58299.

At a glance

Parking Lot #4 Station 01 is a public EV charging station at 120 Washington St in Hart, Michigan, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 20, 2014.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 5 nearby

Station record

DOE registry record

FieldValue
AFDC station ID58299
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJan 20, 2014
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
120 Washington St
City
Hart
ZIP
49420
Coordinates
43.70197, -86.36465

Within ~15 km

Nearby charging

What kind of charging does Parking Lot #4 Station 01 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Michigan average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Parking Lot #4 Station 01 compare with other stations in Hart?

Hart has 3 charging stations in the DOE registry with 6 ports. Parking Lot #4 Station 01 accounts for 33% of the charging ports in Hart. It is the only ChargePoint station in Hart. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.

Who operates Parking Lot #4 Station 01?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,008 of those stations are in Michigan, 45% of the state's 2,228.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 20, 2014, one of 22 stations in Michigan with a 2014 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Parking Lot #4 Station 01 have?

Parking Lot #4 Station 01 has 2 charging ports: 2 Level 2.

Does Parking Lot #4 Station 01 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Parking Lot #4 Station 01 have?

Parking Lot #4 Station 01 has J1772 connectors.

Is Parking Lot #4 Station 01 open to the public?

Yes. Parking Lot #4 Station 01 is listed with public access, and its status is available.

Where is Parking Lot #4 Station 01?

Parking Lot #4 Station 01 is at 120 Washington St, Hart, MI 49420. Its coordinates are 43.70197, -86.36465.

More EV charging around Hart

Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 58299, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Parking Lot #4 Station 01, Hart, MI (AFDC station 58299)”, https://chargecensus.com/stations/michigan/parking-lot-4-station-01-58299 (data as of October 12, 2026).