ChargeCensus

Nuvufuels Ionia Nuvu 1

Available

EV charging station in Ionia, Michigan on the ChargePoint network — 1 DC fast. US DOE AFDC station 181681.

At a glance

Nuvufuels Ionia Nuvu 1 is a public EV charging station at 75 E Grand River Ave in Ionia, Michigan, on the ChargePoint network. It has 1 charging port (1 DC fast) with CHAdeMO and CCS connectors. The US DOE registry lists it as available, open since Jan 27, 2021.

Total ports
1
DC fast
1
Level 2
0
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 1 nearby

Station record

DOE registry record

FieldValue
AFDC station ID181681
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJan 27, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • CHAdeMO — Legacy DC fast connector (Nissan Leaf era).
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
75 E Grand River Ave
City
Ionia
ZIP
48846
Coordinates
42.88598, -85.07378

Within ~15 km

Nearby charging

What kind of charging does Nuvufuels Ionia Nuvu 1 offer?

Of its 1 port, 1 is DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 65% below the Michigan average of 2.8 ports per station. The registry lists 2 connector types: CHAdeMO, Legacy DC fast connector (Nissan Leaf era); CCS, Combined Charging System — the J1772-based DC fast connector.

How does Nuvufuels Ionia Nuvu 1 compare with other stations in Ionia?

Ionia has 2 charging stations in the DOE registry with 2 ports. Nuvufuels Ionia Nuvu 1 accounts for 50% of the charging ports in Ionia. ChargePoint runs 2 stations in Ionia. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.

Who operates Nuvufuels Ionia Nuvu 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,008 of those stations are in Michigan, 45% of the state's 2,228.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 243 stations in Michigan with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Nuvufuels Ionia Nuvu 1 have?

Nuvufuels Ionia Nuvu 1 has 1 charging port: 1 DC fast.

Does Nuvufuels Ionia Nuvu 1 have DC fast charging?

Yes. The registry lists 1 DC fast port at Nuvufuels Ionia Nuvu 1, with CHAdeMO and CCS connectors.

What connectors does Nuvufuels Ionia Nuvu 1 have?

Nuvufuels Ionia Nuvu 1 has CHAdeMO and CCS connectors.

Is Nuvufuels Ionia Nuvu 1 open to the public?

Yes. Nuvufuels Ionia Nuvu 1 is listed with public access, and its status is available.

Where is Nuvufuels Ionia Nuvu 1?

Nuvufuels Ionia Nuvu 1 is at 75 E Grand River Ave, Ionia, MI 48846. Its coordinates are 42.88598, -85.07378.

More EV charging around Ionia

Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 181681, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Nuvufuels Ionia Nuvu 1, Ionia, MI (AFDC station 181681)”, https://chargecensus.com/stations/michigan/nuvufuels-ionia-nuvu-1-181681 (data as of October 12, 2026).