Monroe EV Chgrs South Unit
AvailableEV charging station in Sturgis, Michigan on the ChargePoint network — 2 Level 2. US DOE AFDC station 462515.
At a glance
Monroe EV Chgrs South Unit is a public EV charging station at 133 N Nottawa St in Sturgis, Michigan, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jul 1, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 462515 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jul 1, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 133 N Nottawa St
- City
- Sturgis
- State
- Michigan
- ZIP
- 49091
- Coordinates
- 41.80086, -85.41806
Within ~15 km
Nearby charging
Tesla Supercharger · Available
Tesla Supercharger · Available
- Gocc Station A -12 ports
ChargePoint · Available
- Gocc Station A2 ports
ChargePoint · Available
- Monroe EV Chgrs North Unit2 ports
ChargePoint · Available
EV Connect · Available
What kind of charging does Monroe EV Chgrs South Unit offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Michigan average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Monroe EV Chgrs South Unit compare with other stations in Sturgis?
Sturgis has 4 charging stations in the DOE registry with 6 ports. Monroe EV Chgrs South Unit accounts for 33% of the charging ports in Sturgis. ChargePoint runs 2 stations in Sturgis. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.
Who operates Monroe EV Chgrs South Unit?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,008 of those stations are in Michigan, 45% of the state's 2,228.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jul 1, 2026, one of 234 stations in Michigan with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Monroe EV Chgrs South Unit have?
Monroe EV Chgrs South Unit has 2 charging ports: 2 Level 2.
Does Monroe EV Chgrs South Unit have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Monroe EV Chgrs South Unit have?
Monroe EV Chgrs South Unit has J1772 connectors.
Is Monroe EV Chgrs South Unit open to the public?
Yes. Monroe EV Chgrs South Unit is listed with public access, and its status is available.
Where is Monroe EV Chgrs South Unit?
Monroe EV Chgrs South Unit is at 133 N Nottawa St, Sturgis, MI 49091. Its coordinates are 41.80086, -85.41806.
More EV charging around Sturgis
Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 462515, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Monroe EV Chgrs South Unit, Sturgis, MI (AFDC station 462515)”, https://chargecensus.com/stations/michigan/monroe-ev-chgrs-south-unit-462515 (data as of October 12, 2026).