Main Campus Cent West 2
AvailableEV charging station in Zeeland, Michigan on the ChargePoint network — 2 Level 2. US DOE AFDC station 171304.
At a glance
Main Campus Cent West 2 is a public EV charging station at Innovation Dr in Zeeland, Michigan, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 15, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 171304 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 15, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
- Holland, MI - Tesla Supercharger12 ports
Tesla Supercharger · Available
- 640 East 8th Street4 ports
EV Connect · Available
- Outdoor Discovery Center4 ports
Red E · Available
- Freedom Village4 ports
Noodoe · Available
- Residence Inn Holland4 ports
evGateway · Available
Red E · Available
What kind of charging does Main Campus Cent West 2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Michigan average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Main Campus Cent West 2 compare with other stations in Zeeland?
Zeeland has 31 charging stations in the DOE registry with 59 ports, the 9th-most of 355 cities and towns in Michigan. Main Campus Cent West 2 accounts for 3% of the charging ports in Zeeland. ChargePoint runs 31 stations in Zeeland. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.
Who operates Main Campus Cent West 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,008 of those stations are in Michigan, 45% of the state's 2,228.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 15, 2021, one of 243 stations in Michigan with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Main Campus Cent West 2 have?
Main Campus Cent West 2 has 2 charging ports: 2 Level 2.
Does Main Campus Cent West 2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Main Campus Cent West 2 have?
Main Campus Cent West 2 has J1772 connectors.
Is Main Campus Cent West 2 open to the public?
Yes. Main Campus Cent West 2 is listed with public access, and its status is available.
Where is Main Campus Cent West 2?
Main Campus Cent West 2 is at Innovation Dr, Zeeland, MI 49464. Its coordinates are 42.82369, -86.01444.
More EV charging around Zeeland
Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 171304, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Main Campus Cent West 2, Zeeland, MI (AFDC station 171304)”, https://chargecensus.com/stations/michigan/main-campus-cent-west-2-171304 (data as of October 12, 2026).