Lake Trust Cu Lake Trust -03
AvailableEV charging station in Brighton, Michigan on the ChargePoint network — 2 Level 2. US DOE AFDC station 458106.
At a glance
Lake Trust Cu Lake Trust -03 is a public EV charging station at 8661 W Grand River Ave in Brighton, Michigan, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 24, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 458106 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Apr 24, 2026 |
| Last updated at source | Oct 18, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 8661 W Grand River Ave
- City
- Brighton
- State
- Michigan
- ZIP
- 48116
- Coordinates
- 42.53930, -83.78501
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Brighton Ford10 ports
Blink · Available
- Bob Maxey Ford of Howell6 ports
Red E · Available
- Brighton Ford - DCFC6 ports
Blink · Available
- CAE Inc5 ports
Non-networked · Available
- SLDCC Building4 ports
Red E · Available
What kind of charging does Lake Trust Cu Lake Trust -03 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 29% below the Michigan average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Lake Trust Cu Lake Trust -03 compare with other stations in Brighton?
Brighton has 8 charging stations in the DOE registry with 38 ports. Lake Trust Cu Lake Trust -03 accounts for 5% of the charging ports in Brighton. ChargePoint runs 3 stations in Brighton. Statewide, Michigan has 2,232 stations and 6,328 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.
Who operates Lake Trust Cu Lake Trust -03?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,969 stations in the registry across 52 states, with 5,026 DC fast and 83,347 Level 2 ports in total. 1,013 of those stations are in Michigan, 45% of the state's 2,232.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 24, 2026, one of 239 stations in Michigan with a 2026 open date. The station's record was last updated at the source on Oct 18, 2026.
Frequently asked questions
How many chargers does Lake Trust Cu Lake Trust -03 have?
Lake Trust Cu Lake Trust -03 has 2 charging ports: 2 Level 2.
Does Lake Trust Cu Lake Trust -03 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Lake Trust Cu Lake Trust -03 have?
Lake Trust Cu Lake Trust -03 has J1772 connectors.
Is Lake Trust Cu Lake Trust -03 open to the public?
Yes. Lake Trust Cu Lake Trust -03 is listed with public access, and its status is available.
Where is Lake Trust Cu Lake Trust -03?
Lake Trust Cu Lake Trust -03 is at 8661 W Grand River Ave, Brighton, MI 48116. Its coordinates are 42.53930, -83.78501.
More EV charging around Brighton
Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 458106, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 19, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Lake Trust Cu Lake Trust -03, Brighton, MI (AFDC station 458106)”, https://chargecensus.com/stations/michigan/lake-trust-cu-lake-trust-03-458106 (data as of October 19, 2026).