Lag Ct4000
AvailableEV charging station in Royal Oak, Michigan on the ChargePoint network — 2 Level 2. US DOE AFDC station 256963.
At a glance
Lag Ct4000 is a public EV charging station at 30533 Woodward Ave in Royal Oak, Michigan, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Mar 24, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 256963 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Mar 24, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
- Birmingham Pointe Private40 ports
Red E · Available
- Detroit, MI - Tesla Supercharger20 ports
Tesla Supercharger · Available
- Fountain Circle Apartment Homes16 ports
EV Connect · Available
AmpUp · Available
- Forum Flats Apartments12 ports
Red E · Available
- Meijer Warren #23712 ports
EVgo · Available
What kind of charging does Lag Ct4000 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Michigan average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Lag Ct4000 compare with other stations in Royal Oak?
Royal Oak has 11 charging stations in the DOE registry with 28 ports. Lag Ct4000 accounts for 7% of the charging ports in Royal Oak. ChargePoint runs 4 stations in Royal Oak. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.
Who operates Lag Ct4000?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,008 of those stations are in Michigan, 45% of the state's 2,228.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Mar 24, 2023, one of 309 stations in Michigan with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Lag Ct4000 have?
Lag Ct4000 has 2 charging ports: 2 Level 2.
Does Lag Ct4000 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Lag Ct4000 have?
Lag Ct4000 has J1772 connectors.
Is Lag Ct4000 open to the public?
Yes. Lag Ct4000 is listed with public access, and its status is available.
Where is Lag Ct4000?
Lag Ct4000 is at 30533 Woodward Ave, Royal Oak, MI 48073. Its coordinates are 42.51402, -83.18320.
More EV charging around Royal Oak
Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 256963, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Lag Ct4000, Royal Oak, MI (AFDC station 256963)”, https://chargecensus.com/stations/michigan/lag-ct4000-256963 (data as of October 12, 2026).