itselectric - DT04
AvailableEV charging station in Detroit, Michigan on the Itselectric network — 1 Level 2. US DOE AFDC station 449179.
At a glance
itselectric - DT04 is a public EV charging station at 2050 15th St in Detroit, Michigan, on the Itselectric network. It has 1 charging port (1 Level 2) with J1772 and NACS (Tesla) connectors. The US DOE registry lists it as available, open since May 2, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 449179 |
| Network | Itselectric |
| Status | Available (E) |
| Access | Public |
| Facility | Street parking |
| Open date | May 2, 2025 |
| Last updated at source | Feb 13, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
- NACS (Tesla) — The North American Charging Standard connector.
Pricing: $0.40 per kWh
Within ~15 km
Nearby charging
- Brush Watson Apartments79 ports
Red E · Available
- Bagley Mobility Hub32 ports
Red E · Available
- Detroit, MI - Tesla Supercharger20 ports
Tesla Supercharger · Available
- Mc320 ports
Red E · Available
- Deaconess Tower12 ports
Blink · Available
- Mission Ford of Dearborn11 ports
Red E · Available
What kind of charging does itselectric - DT04 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 65% below the Michigan average of 2.8 ports per station. The registry lists 2 connector types: J1772, the standard Level 1/2 AC connector; NACS (Tesla), the North American Charging Standard connector. Pricing as reported to the registry: “$0.40 per kWh”. The site is listed as a street parking location.
How does itselectric - DT04 compare with other stations in Detroit?
Detroit has 273 charging stations in the DOE registry with 832 ports, the most of 355 cities and towns in Michigan. itselectric - DT04 accounts for under 1% of the charging ports in Detroit. Itselectric runs 4 stations in Detroit. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.
Who operates itselectric - DT04?
Itselectric operates 16 stations in the registry across 6 states, with 23 Level 2 ports in total. 4 of those stations are in Michigan, under 1% of the state's 2,228.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 2, 2025, one of 417 stations in Michigan with a 2025 open date. The station's record was last updated at the source on Feb 13, 2026.
Frequently asked questions
How many chargers does itselectric - DT04 have?
itselectric - DT04 has 1 charging port: 1 Level 2.
Does itselectric - DT04 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does itselectric - DT04 have?
itselectric - DT04 has J1772 and NACS (Tesla) connectors.
Is charging at itselectric - DT04 free?
Pricing as reported to the DOE registry: $0.40 per kWh.
Is itselectric - DT04 open to the public?
Yes. itselectric - DT04 is listed with public access, and its status is available.
Where is itselectric - DT04?
itselectric - DT04 is at 2050 15th St, Detroit, MI 48216. Its coordinates are 42.32834, -83.07549.
More EV charging around Detroit
Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 449179, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “itselectric - DT04, Detroit, MI (AFDC station 449179)”, https://chargecensus.com/stations/michigan/itselectric-dt04-449179 (data as of October 12, 2026).