IBEW Local 58 EV Lot
AvailableEV charging station in Detroit, Michigan on the Red E network — 2 DC fast. US DOE AFDC station 448930.
At a glance
IBEW Local 58 EV Lot is a public EV charging station at 1358 Abbott Street in Detroit, Michigan, on the Red E network. It has 2 charging ports (2 DC fast) with CCS and NACS (Tesla) connectors. The US DOE registry lists it as available, open since Dec 13, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 448930 |
| Network | Red E |
| Status | Available (E) |
| Access | Public |
| Facility | Public site |
| Open date | Dec 13, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- CCS — Combined Charging System — the J1772-based DC fast connector.
- NACS (Tesla) — The North American Charging Standard connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
- Brush Watson Apartments79 ports
Red E · Available
- Bagley Mobility Hub32 ports
Red E · Available
- Mc320 ports
Red E · Available
- Detroit, MI - Tesla Supercharger20 ports
Tesla Supercharger · Available
- Mission Ford of Dearborn11 ports
Red E · Available
- Beaubian Place Garage10 ports
Non-networked · Available
What kind of charging does IBEW Local 58 EV Lot offer?
Of its 2 ports, 2 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about 30% below the Michigan average of 2.8 ports per station. The registry lists 2 connector types: CCS, Combined Charging System — the J1772-based DC fast connector; NACS (Tesla), the North American Charging Standard connector. The site is listed as a public site location.
How does IBEW Local 58 EV Lot compare with other stations in Detroit?
Detroit has 273 charging stations in the DOE registry with 832 ports, the most of 355 cities and towns in Michigan. IBEW Local 58 EV Lot accounts for under 1% of the charging ports in Detroit. Red E runs 59 stations in Detroit. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.
Who operates IBEW Local 58 EV Lot?
Red E operates 1,105 stations in the registry across 47 states, with 2,240 DC fast and 2,633 Level 2 ports in total. 442 of those stations are in Michigan, 20% of the state's 2,228.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 13, 2025, one of 417 stations in Michigan with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does IBEW Local 58 EV Lot have?
IBEW Local 58 EV Lot has 2 charging ports: 2 DC fast.
Does IBEW Local 58 EV Lot have DC fast charging?
Yes. The registry lists 2 DC fast ports at IBEW Local 58 EV Lot, with CCS and NACS (Tesla) connectors.
What connectors does IBEW Local 58 EV Lot have?
IBEW Local 58 EV Lot has CCS and NACS (Tesla) connectors.
Is IBEW Local 58 EV Lot open to the public?
Yes. IBEW Local 58 EV Lot is listed with public access, and its status is available.
Where is IBEW Local 58 EV Lot?
IBEW Local 58 EV Lot is at 1358 Abbott Street, Detroit, MI 48226. Its coordinates are 42.32807, -83.06209.
More EV charging around Detroit
Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 448930, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “IBEW Local 58 EV Lot, Detroit, MI (AFDC station 448930)”, https://chargecensus.com/stations/michigan/ibew-local-58-ev-lot-448930 (data as of October 12, 2026).