Grayling, MI
AvailableEV charging station in Grayling, Michigan on the Rivian Adventure Network network — 6 DC fast. US DOE AFDC station 391365.
At a glance
Grayling, MI is a public EV charging station at 2384 I-75BL in Grayling, Michigan, on the Rivian Adventure Network network. It has 6 charging ports (6 DC fast) with NACS (Tesla) connectors. The US DOE registry lists it as available, open since Feb 17, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 391365 |
| Network | Rivian Adventure Network |
| Status | Available (E) |
| Access | Public |
| Facility | Public site |
| Open date | Feb 17, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- NACS (Tesla) — The North American Charging Standard connector.
Pricing: not listed in the DOE registry.
Charging network
Operates 161 stations in the DOE registry — view the full network →
Location
- Address
- 2384 I-75BL
- City
- Grayling
- State
- Michigan
- ZIP
- 49738
- Coordinates
- 44.65091, -84.70892
Within ~15 km
Nearby charging
Rivian Waypoints · Available
- Kirtland Community College2 ports
Red E · Available
- Grayling Public Parking2 ports
Red E · Available
- Campground Ev1$ Campground2 ports
ChargePoint · Available
- Hartwick Pines State Park2 ports
Rivian Waypoints · Available
- Dairy Queen1 ports
Non-networked · Available
What kind of charging does Grayling, MI offer?
Of its 6 ports, 6 are DC fast. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. That is about twice the Michigan average of 2.8 ports per station. The registry lists one connector type: NACS (Tesla), the North American Charging Standard connector. The site is listed as a public site location.
How does Grayling, MI compare with other stations in Grayling?
Grayling has 9 charging stations in the DOE registry with 18 ports. Grayling, MI accounts for 33% of the charging ports in Grayling. It is the only Rivian Adventure Network station in Grayling. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.
Who operates Grayling, MI?
Rivian's DC fast network sited near trailheads and outdoor destinations. Rivian Adventure Network operates 161 stations in the registry across 39 states, with 1,144 DC fast ports in total. 10 of those stations are in Michigan, under 1% of the state's 2,228.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 17, 2023, one of 309 stations in Michigan with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Grayling, MI have?
Grayling, MI has 6 charging ports: 6 DC fast.
Does Grayling, MI have DC fast charging?
Yes. The registry lists 6 DC fast ports at Grayling, MI, with NACS (Tesla) connectors.
What connectors does Grayling, MI have?
Grayling, MI has NACS (Tesla) connectors.
Is Grayling, MI open to the public?
Yes. Grayling, MI is listed with public access, and its status is available.
Where is Grayling, MI?
Grayling, MI is at 2384 I-75BL, Grayling, MI 49738. Its coordinates are 44.65091, -84.70892.
More EV charging around Grayling
Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 391365, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Grayling, MI, Grayling, MI (AFDC station 391365)”, https://chargecensus.com/stations/michigan/grayling-mi-391365 (data as of October 12, 2026).