Galleria of Northville
AvailableEV charging station in Northville, Michigan on the Red E network — 2 Level 2. US DOE AFDC station 400224.
At a glance
Galleria of Northville is a public EV charging station at 51305 7 Mile in Northville, Michigan, on the Red E network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 23, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 400224 |
| Network | Red E |
| Status | Available (E) |
| Access | Public |
| Facility | Public site |
| Open date | Jun 23, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 51305 7 Mile
- City
- Northville
- State
- Michigan
- ZIP
- 48167
- Coordinates
- 42.42104, -83.55038
Within ~15 km
Nearby charging
- Plymouth Walk Apartments16 ports
Red E · Available
- Plymouth, MI12 ports
Rivian Adventure Network · Available
Tesla Supercharger · Available
- Serra Ford Farmington Hills10 ports
Red E · Available
- Sakura Novi Residential10 ports
Red E · Available
- Cadillac of Novi8 ports
Red E · Available
What kind of charging does Galleria of Northville offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Michigan average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a public site location.
How does Galleria of Northville compare with other stations in Northville?
Northville has 9 charging stations in the DOE registry with 39 ports. Galleria of Northville accounts for 5% of the charging ports in Northville. Red E runs 4 stations in Northville. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.
Who operates Galleria of Northville?
Red E operates 1,105 stations in the registry across 47 states, with 2,240 DC fast and 2,633 Level 2 ports in total. 442 of those stations are in Michigan, 20% of the state's 2,228.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 23, 2025, one of 417 stations in Michigan with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Galleria of Northville have?
Galleria of Northville has 2 charging ports: 2 Level 2.
Does Galleria of Northville have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Galleria of Northville have?
Galleria of Northville has J1772 connectors.
Is Galleria of Northville open to the public?
Yes. Galleria of Northville is listed with public access, and its status is available.
Where is Galleria of Northville?
Galleria of Northville is at 51305 7 Mile, Northville, MI 48167. Its coordinates are 42.42104, -83.55038.
More EV charging around Northville
Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 400224, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Galleria of Northville, Northville, MI (AFDC station 400224)”, https://chargecensus.com/stations/michigan/galleria-of-northville-400224 (data as of October 12, 2026).