Dtw Airport South Cel Lot
AvailableEV charging station in Romulus, Michigan on the ChargePoint network — 2 Level 2. US DOE AFDC station 98755.
At a glance
Dtw Airport South Cel Lot is a public EV charging station at 34697 Eureka Rd South east corner of Lot in Romulus, Michigan, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 6, 2018.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 98755 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 6, 2018 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 34697 Eureka Rd South east corner of Lot
- City
- Romulus
- State
- Michigan
- ZIP
- 48174
- Coordinates
- 42.19421, -83.37668
Within ~15 km
Nearby charging
- Taylor, MI - Tesla Supercharger12 ports
Tesla Supercharger · Available
- Warren Valley Golf Course10 ports
Red E · Available
- Taylor Ford10 ports
Red E · Available
- Safeway Oil Office8 ports
Powerpump · Planned
Red E · Available
- Village Ford5 ports
Red E · Available
What kind of charging does Dtw Airport South Cel Lot offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Michigan average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Dtw Airport South Cel Lot compare with other stations in Romulus?
Romulus has 9 charging stations in the DOE registry with 16 ports. Dtw Airport South Cel Lot accounts for 13% of the charging ports in Romulus. ChargePoint runs 8 stations in Romulus. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.
Who operates Dtw Airport South Cel Lot?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,008 of those stations are in Michigan, 45% of the state's 2,228.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 6, 2018, one of 39 stations in Michigan with a 2018 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Dtw Airport South Cel Lot have?
Dtw Airport South Cel Lot has 2 charging ports: 2 Level 2.
Does Dtw Airport South Cel Lot have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Dtw Airport South Cel Lot have?
Dtw Airport South Cel Lot has J1772 connectors.
Is Dtw Airport South Cel Lot open to the public?
Yes. Dtw Airport South Cel Lot is listed with public access, and its status is available.
Where is Dtw Airport South Cel Lot?
Dtw Airport South Cel Lot is at 34697 Eureka Rd South east corner of Lot, Romulus, MI 48174. Its coordinates are 42.19421, -83.37668.
More EV charging around Romulus
Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 98755, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Dtw Airport South Cel Lot, Romulus, MI (AFDC station 98755)”, https://chargecensus.com/stations/michigan/dtw-airport-south-cel-lot-98755 (data as of October 12, 2026).