ChargeCensus

Dtw Airport Bluedeck 4g #2

Available

EV charging station in Detroit, Michigan on the ChargePoint network — 2 Level 2. US DOE AFDC station 173239.

At a glance

Dtw Airport Bluedeck 4g #2 is a public EV charging station at International Dr BBD Lvl 4 Yellow West or fly in Detroit, Michigan, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID173239
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJan 27, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
International Dr BBD Lvl 4 Yellow West or fly
ZIP
48242
Coordinates
42.22483, -83.34712

Within ~15 km

Nearby charging

What kind of charging does Dtw Airport Bluedeck 4g #2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Michigan average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Dtw Airport Bluedeck 4g #2 compare with other stations in Detroit?

Detroit has 273 charging stations in the DOE registry with 832 ports, the most of 355 cities and towns in Michigan. Dtw Airport Bluedeck 4g #2 accounts for under 1% of the charging ports in Detroit. ChargePoint runs 171 stations in Detroit. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.

Who operates Dtw Airport Bluedeck 4g #2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,008 of those stations are in Michigan, 45% of the state's 2,228.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 243 stations in Michigan with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Dtw Airport Bluedeck 4g #2 have?

Dtw Airport Bluedeck 4g #2 has 2 charging ports: 2 Level 2.

Does Dtw Airport Bluedeck 4g #2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Dtw Airport Bluedeck 4g #2 have?

Dtw Airport Bluedeck 4g #2 has J1772 connectors.

Is Dtw Airport Bluedeck 4g #2 open to the public?

Yes. Dtw Airport Bluedeck 4g #2 is listed with public access, and its status is available.

Where is Dtw Airport Bluedeck 4g #2?

Dtw Airport Bluedeck 4g #2 is at International Dr BBD Lvl 4 Yellow West or fly, Detroit, MI 48242. Its coordinates are 42.22483, -83.34712.

More EV charging around Detroit

Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 173239, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Dtw Airport Bluedeck 4g #2, Detroit, MI (AFDC station 173239)”, https://chargecensus.com/stations/michigan/dtw-airport-bluedeck-4g-2-173239 (data as of October 12, 2026).