Buist Electric
AvailableEV charging station in Byron Center, Michigan, not on a charging network — 2 Level 2. US DOE AFDC station 333982.
At a glance
Buist Electric is a public EV charging station at 2 84 St SW in Byron Center, Michigan, not attached to a charging network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 1, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 333982 |
| Network | Non-networked |
| Status | Available (E) |
| Access | Public |
| Facility | Parking lot |
| Open date | Oct 1, 2021 |
| Last updated at source | Jan 28, 2025 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 2 84 St SW
- City
- Byron Center
- State
- Michigan
- ZIP
- 49315
- Coordinates
- 42.81102, -85.66443
Within ~15 km
Nearby charging
- U of M Health Wyoming MI12 ports
Red E · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
Non-networked · Available
Red E · Available
- Staybridge Suites6 ports
Non-networked · Available
What kind of charging does Buist Electric offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Michigan average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector. The site is listed as a parking lot location.
How does Buist Electric compare with other stations in Byron Center?
Byron Center has 4 charging stations in the DOE registry with 10 ports. Buist Electric accounts for 20% of the charging ports in Byron Center. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.
Who operates Buist Electric?
Buist Electric is listed as non-networked: its chargers are not run through a charging-network account. Michigan has 331 non-networked stations, 15% of its total.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 1, 2021, one of 243 stations in Michigan with a 2021 open date. The station's record was last updated at the source on Jan 28, 2025.
Frequently asked questions
How many chargers does Buist Electric have?
Buist Electric has 2 charging ports: 2 Level 2.
Does Buist Electric have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Buist Electric have?
Buist Electric has J1772 connectors.
Is Buist Electric open to the public?
Yes. Buist Electric is listed with public access, and its status is available.
Where is Buist Electric?
Buist Electric is at 2 84 St SW, Byron Center, MI 49315. Its coordinates are 42.81102, -85.66443.
More EV charging around Byron Center
Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 333982, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Buist Electric, Byron Center, MI (AFDC station 333982)”, https://chargecensus.com/stations/michigan/buist-electric-333982 (data as of October 12, 2026).