ChargeCensus

Bedrock Ql Data Ctr S-2

Available

EV charging station in Detroit, Michigan on the ChargePoint network — 2 Level 2. US DOE AFDC station 153654.

At a glance

Bedrock Ql Data Ctr S-2 is a public EV charging station at 1401 Rosa Parks Blvd in Detroit, Michigan, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 12, 2020.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID153654
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateFeb 12, 2020
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
1401 Rosa Parks Blvd
ZIP
48216
Coordinates
42.32600, -83.06930

Within ~15 km

Nearby charging

What kind of charging does Bedrock Ql Data Ctr S-2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Michigan average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Bedrock Ql Data Ctr S-2 compare with other stations in Detroit?

Detroit has 273 charging stations in the DOE registry with 832 ports, the most of 355 cities and towns in Michigan. Bedrock Ql Data Ctr S-2 accounts for under 1% of the charging ports in Detroit. ChargePoint runs 171 stations in Detroit. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.

Who operates Bedrock Ql Data Ctr S-2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,008 of those stations are in Michigan, 45% of the state's 2,228.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 12, 2020, one of 54 stations in Michigan with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Bedrock Ql Data Ctr S-2 have?

Bedrock Ql Data Ctr S-2 has 2 charging ports: 2 Level 2.

Does Bedrock Ql Data Ctr S-2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Bedrock Ql Data Ctr S-2 have?

Bedrock Ql Data Ctr S-2 has J1772 connectors.

Is Bedrock Ql Data Ctr S-2 open to the public?

Yes. Bedrock Ql Data Ctr S-2 is listed with public access, and its status is available.

Where is Bedrock Ql Data Ctr S-2?

Bedrock Ql Data Ctr S-2 is at 1401 Rosa Parks Blvd, Detroit, MI 48216. Its coordinates are 42.32600, -83.06930.

More EV charging around Detroit

Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 153654, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Bedrock Ql Data Ctr S-2, Detroit, MI (AFDC station 153654)”, https://chargecensus.com/stations/michigan/bedrock-ql-data-ctr-s-2-153654 (data as of October 12, 2026).