Bedrock New Center 1-2
AvailableEV charging station in Detroit, Michigan on the ChargePoint network — 2 Level 2. US DOE AFDC station 76147.
At a glance
Bedrock New Center 1-2 is a public EV charging station at 116 Lothrop Rd in Detroit, Michigan, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 4, 2016.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 76147 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 4, 2016 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Within ~15 km
Nearby charging
- Brush Watson Apartments79 ports
Red E · Available
- Bagley Mobility Hub32 ports
Red E · Available
- Detroit, MI - Tesla Supercharger20 ports
Tesla Supercharger · Available
- Mc320 ports
Red E · Available
- Meijer Warren #23712 ports
EVgo · Available
- Mission Ford of Dearborn11 ports
Red E · Available
What kind of charging does Bedrock New Center 1-2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Michigan average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Bedrock New Center 1-2 compare with other stations in Detroit?
Detroit has 273 charging stations in the DOE registry with 832 ports, the most of 355 cities and towns in Michigan. Bedrock New Center 1-2 accounts for under 1% of the charging ports in Detroit. ChargePoint runs 171 stations in Detroit. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.
Who operates Bedrock New Center 1-2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,008 of those stations are in Michigan, 45% of the state's 2,228.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 4, 2016, one of 24 stations in Michigan with a 2016 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Bedrock New Center 1-2 have?
Bedrock New Center 1-2 has 2 charging ports: 2 Level 2.
Does Bedrock New Center 1-2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Bedrock New Center 1-2 have?
Bedrock New Center 1-2 has J1772 connectors.
Is Bedrock New Center 1-2 open to the public?
Yes. Bedrock New Center 1-2 is listed with public access, and its status is available.
Where is Bedrock New Center 1-2?
Bedrock New Center 1-2 is at 116 Lothrop Rd, Detroit, MI 48202. Its coordinates are 42.37105, -83.07617.
More EV charging around Detroit
Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 76147, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Bedrock New Center 1-2, Detroit, MI (AFDC station 76147)”, https://chargecensus.com/stations/michigan/bedrock-new-center-1-2-76147 (data as of October 12, 2026).