ChargeCensus

Bedrock Hud B1-8

Available

EV charging station in Detroit, Michigan on the ChargePoint network — 2 Level 2. US DOE AFDC station 450465.

At a glance

Bedrock Hud B1-8 is a public EV charging station at 1240 Woodward Avenue in Detroit, Michigan, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 31, 2026.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID450465
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJan 31, 2026
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
1240 Woodward Avenue
ZIP
48226
Coordinates
42.33397, -83.04800

Within ~15 km

Nearby charging

What kind of charging does Bedrock Hud B1-8 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Michigan average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Bedrock Hud B1-8 compare with other stations in Detroit?

Detroit has 273 charging stations in the DOE registry with 832 ports, the most of 355 cities and towns in Michigan. Bedrock Hud B1-8 accounts for under 1% of the charging ports in Detroit. ChargePoint runs 171 stations in Detroit. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.

Who operates Bedrock Hud B1-8?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,008 of those stations are in Michigan, 45% of the state's 2,228.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 31, 2026, one of 234 stations in Michigan with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Bedrock Hud B1-8 have?

Bedrock Hud B1-8 has 2 charging ports: 2 Level 2.

Does Bedrock Hud B1-8 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Bedrock Hud B1-8 have?

Bedrock Hud B1-8 has J1772 connectors.

Is Bedrock Hud B1-8 open to the public?

Yes. Bedrock Hud B1-8 is listed with public access, and its status is available.

Where is Bedrock Hud B1-8?

Bedrock Hud B1-8 is at 1240 Woodward Avenue, Detroit, MI 48226. Its coordinates are 42.33397, -83.04800.

More EV charging around Detroit

Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 450465, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Bedrock Hud B1-8, Detroit, MI (AFDC station 450465)”, https://chargecensus.com/stations/michigan/bedrock-hud-b1-8-450465 (data as of October 12, 2026).