ChargeCensus

Bedrock Greektown 1-3

Available

EV charging station in Detroit, Michigan on the ChargePoint network — 2 Level 2. US DOE AFDC station 259001.

At a glance

Bedrock Greektown 1-3 is a public EV charging station at 1001 Brush St in Detroit, Michigan, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 12, 2023.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID259001
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateApr 12, 2023
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
1001 Brush St
ZIP
48226
Coordinates
42.33357, -83.04401

Within ~15 km

Nearby charging

What kind of charging does Bedrock Greektown 1-3 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 30% below the Michigan average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Bedrock Greektown 1-3 compare with other stations in Detroit?

Detroit has 273 charging stations in the DOE registry with 832 ports, the most of 355 cities and towns in Michigan. Bedrock Greektown 1-3 accounts for under 1% of the charging ports in Detroit. ChargePoint runs 171 stations in Detroit. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.

Who operates Bedrock Greektown 1-3?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,008 of those stations are in Michigan, 45% of the state's 2,228.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 12, 2023, one of 309 stations in Michigan with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Bedrock Greektown 1-3 have?

Bedrock Greektown 1-3 has 2 charging ports: 2 Level 2.

Does Bedrock Greektown 1-3 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Bedrock Greektown 1-3 have?

Bedrock Greektown 1-3 has J1772 connectors.

Is Bedrock Greektown 1-3 open to the public?

Yes. Bedrock Greektown 1-3 is listed with public access, and its status is available.

Where is Bedrock Greektown 1-3?

Bedrock Greektown 1-3 is at 1001 Brush St, Detroit, MI 48226. Its coordinates are 42.33357, -83.04401.

More EV charging around Detroit

Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 259001, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Bedrock Greektown 1-3, Detroit, MI (AFDC station 259001)”, https://chargecensus.com/stations/michigan/bedrock-greektown-1-3-259001 (data as of October 12, 2026).