ChargeCensus

Audi Grand Rapids

Available

EV charging station in Cascade, Michigan, not on a charging network — 2 DC fast · 2 Level 2. US DOE AFDC station 91890.

At a glance

Audi Grand Rapids is a public EV charging station at 6045 28th St SE in Cascade, Michigan, not attached to a charging network. It has 4 charging ports (2 DC fast · 2 Level 2) with J1772 and CCS connectors. The US DOE registry lists it as available, open since Apr 1, 2016.

Total ports
4
DC fast
2
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID91890
NetworkNon-networked
StatusAvailable (E)
AccessPublic
FacilityCar dealership
Open dateApr 1, 2016
Last updated at sourceDec 18, 2025

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.
  • CCS — Combined Charging System — the J1772-based DC fast connector.

Pricing: not listed in the DOE registry.

Charging network

Non-networked

Operates 8,784 stations in the DOE registry — view the full network →

Location

Address
6045 28th St SE
City
Cascade
ZIP
49546
Coordinates
42.91385, -85.51845

Within ~15 km

Nearby charging

What kind of charging does Audi Grand Rapids offer?

Of its 4 ports, 2 are DC fast and 2 are Level 2. DC fast ports deliver direct current straight to the battery and are the ones used for quick stops on longer trips. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 41% above the Michigan average of 2.8 ports per station. The registry lists 2 connector types: J1772, the standard Level 1/2 AC connector; CCS, Combined Charging System — the J1772-based DC fast connector. The site is listed as a car dealership location.

How does Audi Grand Rapids compare with other stations in Cascade?

Cascade has 1 charging station in the DOE registry with 4 ports. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.

Who operates Audi Grand Rapids?

Audi Grand Rapids is listed as non-networked: its chargers are not run through a charging-network account. Michigan has 331 non-networked stations, 15% of its total.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 1, 2016, one of 24 stations in Michigan with a 2016 open date. The station's record was last updated at the source on Dec 18, 2025.

Frequently asked questions

How many chargers does Audi Grand Rapids have?

Audi Grand Rapids has 4 charging ports: 2 DC fast · 2 Level 2.

Does Audi Grand Rapids have DC fast charging?

Yes. The registry lists 2 DC fast ports at Audi Grand Rapids, with CCS connectors.

What connectors does Audi Grand Rapids have?

Audi Grand Rapids has J1772 and CCS connectors.

Is Audi Grand Rapids open to the public?

Yes. Audi Grand Rapids is listed with public access, and its status is available.

Where is Audi Grand Rapids?

Audi Grand Rapids is at 6045 28th St SE, Cascade, MI 49546. Its coordinates are 42.91385, -85.51845.

More EV charging around Cascade

Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 91890, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Audi Grand Rapids, Cascade, MI (AFDC station 91890)”, https://chargecensus.com/stations/michigan/audi-grand-rapids-91890 (data as of October 12, 2026).