Arnold Arnold 1icc 1
AvailableEV charging station in Sterling Heights, Michigan on the ChargePoint network — 1 Level 2. US DOE AFDC station 434167.
At a glance
Arnold Arnold 1icc 1 is a public EV charging station at 35900 Mound Road in Sterling Heights, Michigan, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Oct 23, 2025.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 434167 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Oct 23, 2025 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 35900 Mound Road
- City
- Sterling Heights
- State
- Michigan
- ZIP
- 48310
- Coordinates
- 42.55756, -83.04520
Within ~15 km
Nearby charging
- Detroit, MI - Tesla Supercharger20 ports
Tesla Supercharger · Available
AmpUp · Available
- Forum Flats Apartments12 ports
Red E · Available
- Meijer Rochester Hills MI 5712 ports
EVgo · Available
- Meijer Warren #23712 ports
EVgo · Available
FLO · Available
What kind of charging does Arnold Arnold 1icc 1 offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 65% below the Michigan average of 2.8 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Arnold Arnold 1icc 1 compare with other stations in Sterling Heights?
Sterling Heights has 17 charging stations in the DOE registry with 46 ports, the 21st-most of 355 cities and towns in Michigan. Arnold Arnold 1icc 1 accounts for 2% of the charging ports in Sterling Heights. ChargePoint runs 9 stations in Sterling Heights. Statewide, Michigan has 2,228 stations and 6,324 ports, the 11th-largest station count of the 51 states and DC. The biggest station in Michigan, Jackson Mi Sdc in Jackson, has 102 ports.
Who operates Arnold Arnold 1icc 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 1,008 of those stations are in Michigan, 45% of the state's 2,228.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Oct 23, 2025, one of 417 stations in Michigan with a 2025 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Arnold Arnold 1icc 1 have?
Arnold Arnold 1icc 1 has 1 charging port: 1 Level 2.
Does Arnold Arnold 1icc 1 have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Arnold Arnold 1icc 1 have?
Arnold Arnold 1icc 1 has J1772 connectors.
Is Arnold Arnold 1icc 1 open to the public?
Yes. Arnold Arnold 1icc 1 is listed with public access, and its status is available.
Where is Arnold Arnold 1icc 1?
Arnold Arnold 1icc 1 is at 35900 Mound Road, Sterling Heights, MI 48310. Its coordinates are 42.55756, -83.04520.
More EV charging around Sterling Heights
Working with Michigan charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 434167, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Arnold Arnold 1icc 1, Sterling Heights, MI (AFDC station 434167)”, https://chargecensus.com/stations/michigan/arnold-arnold-1icc-1-434167 (data as of October 12, 2026).