EV charging station in Worcester, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 206705.

At a glance

Wsu Wsu-Ev5 is a public EV charging station at 486 Chandler St. in Worcester, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Feb 18, 2022.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID206705
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateFeb 18, 2022
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
486 Chandler St.
ZIP
01602
Coordinates
42.27019, -71.84457

Within ~15 km

Nearby charging

What kind of charging does Wsu Wsu-Ev5 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Wsu Wsu-Ev5 compare with other stations in Worcester?

Worcester has 165 charging stations in the DOE registry with 445 ports, the 3rd-most of 331 cities and towns in Massachusetts. Wsu Wsu-Ev5 accounts for under 1% of the charging ports in Worcester. ChargePoint runs 144 stations in Worcester. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Wsu Wsu-Ev5?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Feb 18, 2022, one of 551 stations in Massachusetts with a 2022 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Wsu Wsu-Ev5 have?

Wsu Wsu-Ev5 has 2 charging ports: 2 Level 2.

Does Wsu Wsu-Ev5 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Wsu Wsu-Ev5 have?

Wsu Wsu-Ev5 has J1772 connectors.

Is Wsu Wsu-Ev5 open to the public?

Yes. Wsu Wsu-Ev5 is listed with public access, and its status is available.

Where is Wsu Wsu-Ev5?

Wsu Wsu-Ev5 is at 486 Chandler St., Worcester, MA 01602. Its coordinates are 42.27019, -71.84457.

More EV charging around Worcester

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 206705, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Wsu Wsu-Ev5, Worcester, MA (AFDC station 206705)”, https://chargecensus.com/stations/massachusetts/wsu-wsu-ev5-206705 (data as of October 12, 2026).