Wjc Station #1
AvailableEV charging station in Newton, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 460301.
At a glance
Wjc Station #1 is a public EV charging station at 1 Wells Avenue in Newton, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 29, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 460301 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | May 29, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 1 Wells Avenue
- City
- Newton
- State
- Massachusetts
- ZIP
- 02459
- Coordinates
- 42.29462, -71.20325
Within ~15 km
Nearby charging
- The Proof64 ports
Loop · Available
- Encore Boston Harbor62 ports
Loop · Available
- Encore Boston Harbor Private43 ports
Loop · Available
Tesla Destination · Available
- Thayer Associates30 ports
Loop · Available
- 100 Chestnut Street29 ports
AmpUp · Available
What kind of charging does Wjc Station #1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Wjc Station #1 compare with other stations in Newton?
Newton has 74 charging stations in the DOE registry with 182 ports, the 8th-most of 331 cities and towns in Massachusetts. Wjc Station #1 accounts for 1% of the charging ports in Newton. ChargePoint runs 60 stations in Newton. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Wjc Station #1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 29, 2026, one of 674 stations in Massachusetts with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Wjc Station #1 have?
Wjc Station #1 has 2 charging ports: 2 Level 2.
Does Wjc Station #1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Wjc Station #1 have?
Wjc Station #1 has J1772 connectors.
Is Wjc Station #1 open to the public?
Yes. Wjc Station #1 is listed with public access, and its status is available.
Where is Wjc Station #1?
Wjc Station #1 is at 1 Wells Avenue, Newton, MA 02459. Its coordinates are 42.29462, -71.20325.
More EV charging around Newton
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 460301, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Wjc Station #1, Newton, MA (AFDC station 460301)”, https://chargecensus.com/stations/massachusetts/wjc-station-1-460301 (data as of October 12, 2026).