Wayside Park Wayside Park 1

Available

EV charging station in Burlington, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 354041.

At a glance

Wayside Park Wayside Park 1 is a public EV charging station at 5 Wayside Road in Burlington, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Aug 28, 2024.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID354041
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateAug 28, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
5 Wayside Road
ZIP
01803
Coordinates
42.48489, -71.19080

Within ~15 km

Nearby charging

What kind of charging does Wayside Park Wayside Park 1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Wayside Park Wayside Park 1 compare with other stations in Burlington?

Burlington has 48 charging stations in the DOE registry with 116 ports, the 14th-most of 331 cities and towns in Massachusetts. Wayside Park Wayside Park 1 accounts for 2% of the charging ports in Burlington. ChargePoint runs 41 stations in Burlington. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Wayside Park Wayside Park 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Aug 28, 2024, one of 833 stations in Massachusetts with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Wayside Park Wayside Park 1 have?

Wayside Park Wayside Park 1 has 2 charging ports: 2 Level 2.

Does Wayside Park Wayside Park 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Wayside Park Wayside Park 1 have?

Wayside Park Wayside Park 1 has J1772 connectors.

Is Wayside Park Wayside Park 1 open to the public?

Yes. Wayside Park Wayside Park 1 is listed with public access, and its status is available.

Where is Wayside Park Wayside Park 1?

Wayside Park Wayside Park 1 is at 5 Wayside Road, Burlington, MA 01803. Its coordinates are 42.48489, -71.19080.

More EV charging around Burlington

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 354041, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Wayside Park Wayside Park 1, Burlington, MA (AFDC station 354041)”, https://chargecensus.com/stations/massachusetts/wayside-park-wayside-park-1-354041 (data as of October 12, 2026).