Vicorcorp Federal-003
AvailableEV charging station in Andover, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 460504.
At a glance
Vicorcorp Federal-003 is a public EV charging station at 400 Federal Street in Andover, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 2, 2026.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 460504 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jun 2, 2026 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 400 Federal Street
- City
- Andover
- State
- Massachusetts
- ZIP
- 01810
- Coordinates
- 42.68295, -71.20188
Within ~15 km
Nearby charging
Tesla Supercharger · Available
- Salem, NH - Tesla Supercharger12 ports
Tesla Supercharger · Available
- Lowell, MA - Tesla Supercharger12 ports
Tesla Supercharger · Available
- Lawrence General Hospital10 ports
FLO · Available
- Fairfield Inn - Tewksbury10 ports
ChargeSmart EV · Available
- Methuen MB.HPC10 ports
Mercedes-Benz HPC · Available
What kind of charging does Vicorcorp Federal-003 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Vicorcorp Federal-003 compare with other stations in Andover?
Andover has 27 charging stations in the DOE registry with 59 ports. Vicorcorp Federal-003 accounts for 3% of the charging ports in Andover. ChargePoint runs 24 stations in Andover. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Vicorcorp Federal-003?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 2, 2026, one of 674 stations in Massachusetts with a 2026 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Vicorcorp Federal-003 have?
Vicorcorp Federal-003 has 2 charging ports: 2 Level 2.
Does Vicorcorp Federal-003 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Vicorcorp Federal-003 have?
Vicorcorp Federal-003 has J1772 connectors.
Is Vicorcorp Federal-003 open to the public?
Yes. Vicorcorp Federal-003 is listed with public access, and its status is available.
Where is Vicorcorp Federal-003?
Vicorcorp Federal-003 is at 400 Federal Street, Andover, MA 01810. Its coordinates are 42.68295, -71.20188.
More EV charging around Andover
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 460504, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Vicorcorp Federal-003, Andover, MA (AFDC station 460504)”, https://chargecensus.com/stations/massachusetts/vicorcorp-federal-003-460504 (data as of October 12, 2026).