ChargeCensus

Umass Memorial Hahnemann #2

Available

EV charging station in Worcester, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 123408.

At a glance

Umass Memorial Hahnemann #2 is a public EV charging station at 65 Uxbridge St in Worcester, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since May 30, 2019.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID123408
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateMay 30, 2019
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
65 Uxbridge St
ZIP
01605
Coordinates
42.28509, -71.78830

Within ~15 km

Nearby charging

What kind of charging does Umass Memorial Hahnemann #2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Umass Memorial Hahnemann #2 compare with other stations in Worcester?

Worcester has 165 charging stations in the DOE registry with 445 ports, the 3rd-most of 331 cities and towns in Massachusetts. Umass Memorial Hahnemann #2 accounts for under 1% of the charging ports in Worcester. ChargePoint runs 144 stations in Worcester. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Umass Memorial Hahnemann #2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on May 30, 2019, one of 106 stations in Massachusetts with a 2019 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Umass Memorial Hahnemann #2 have?

Umass Memorial Hahnemann #2 has 2 charging ports: 2 Level 2.

Does Umass Memorial Hahnemann #2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Umass Memorial Hahnemann #2 have?

Umass Memorial Hahnemann #2 has J1772 connectors.

Is Umass Memorial Hahnemann #2 open to the public?

Yes. Umass Memorial Hahnemann #2 is listed with public access, and its status is available.

Where is Umass Memorial Hahnemann #2?

Umass Memorial Hahnemann #2 is at 65 Uxbridge St, Worcester, MA 01605. Its coordinates are 42.28509, -71.78830.

More EV charging around Worcester

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 123408, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Umass Memorial Hahnemann #2, Worcester, MA (AFDC station 123408)”, https://chargecensus.com/stations/massachusetts/umass-memorial-hahnemann-2-123408 (data as of October 12, 2026).