Tyngsborough Ma Bryant 1
AvailableEV charging station in Tyngsborough, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 195744.
At a glance
Tyngsborough Ma Bryant 1 is a public EV charging station at 25 Bryant Ln in Tyngsborough, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Sep 9, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 195744 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Sep 9, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 25 Bryant Ln
- City
- Tyngsborough
- State
- Massachusetts
- ZIP
- 01879
- Coordinates
- 42.68075, -71.42775
Within ~15 km
Nearby charging
- Abbott School29 ports
AmpUp · Available
Tesla Supercharger · Available
- Lowell, MA - Tesla Supercharger12 ports
Tesla Supercharger · Available
Tesla Supercharger · Available
- Abbot Mill8 ports
Quickcharge · Available
- Westford Town Hall8 ports
AmpUp · Available
What kind of charging does Tyngsborough Ma Bryant 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Tyngsborough Ma Bryant 1 compare with other stations in Tyngsborough?
Tyngsborough has 5 charging stations in the DOE registry with 20 ports. Tyngsborough Ma Bryant 1 accounts for 10% of the charging ports in Tyngsborough. ChargePoint runs 4 stations in Tyngsborough. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Tyngsborough Ma Bryant 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Sep 9, 2021, one of 933 stations in Massachusetts with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Tyngsborough Ma Bryant 1 have?
Tyngsborough Ma Bryant 1 has 2 charging ports: 2 Level 2.
Does Tyngsborough Ma Bryant 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Tyngsborough Ma Bryant 1 have?
Tyngsborough Ma Bryant 1 has J1772 connectors.
Is Tyngsborough Ma Bryant 1 open to the public?
Yes. Tyngsborough Ma Bryant 1 is listed with public access, and its status is available.
Where is Tyngsborough Ma Bryant 1?
Tyngsborough Ma Bryant 1 is at 25 Bryant Ln, Tyngsborough, MA 01879. Its coordinates are 42.68075, -71.42775.
More EV charging around Tyngsborough
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 195744, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Tyngsborough Ma Bryant 1, Tyngsborough, MA (AFDC station 195744)”, https://chargecensus.com/stations/massachusetts/tyngsborough-ma-bryant-1-195744 (data as of October 12, 2026).