Tozer Station 5 Ada
AvailableEV charging station in Beverly, Massachusetts on the ChargePoint network — 1 Level 2. US DOE AFDC station 181901.
At a glance
Tozer Station 5 Ada is a public EV charging station at 30 Tozer Rd in Beverly, Massachusetts, on the ChargePoint network. It has 1 charging port (1 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jan 27, 2021.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 181901 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Jan 27, 2021 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 30 Tozer Rd
- City
- Beverly
- State
- Massachusetts
- ZIP
- 01915
- Coordinates
- 42.57327, -70.88343
Within ~15 km
Nearby charging
- Cummings Center30 ports
Non-networked · Available
- Town of Middleton - town Hall14 ports
OpConnect · Available
Tesla Supercharger · Available
FLO · Available
Tesla Supercharger · Available
- Danvers, MA - Tesla Supercharger12 ports
Tesla Supercharger · Available
What kind of charging does Tozer Station 5 Ada offer?
Of its 1 port, 1 is Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 62% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Tozer Station 5 Ada compare with other stations in Beverly?
Beverly has 42 charging stations in the DOE registry with 114 ports, the 19th-most of 331 cities and towns in Massachusetts. Tozer Station 5 Ada accounts for under 1% of the charging ports in Beverly. ChargePoint runs 36 stations in Beverly. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Tozer Station 5 Ada?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jan 27, 2021, one of 933 stations in Massachusetts with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Tozer Station 5 Ada have?
Tozer Station 5 Ada has 1 charging port: 1 Level 2.
Does Tozer Station 5 Ada have DC fast charging?
No. The registry lists no DC fast ports here; its one port is Level 2.
What connectors does Tozer Station 5 Ada have?
Tozer Station 5 Ada has J1772 connectors.
Is Tozer Station 5 Ada open to the public?
Yes. Tozer Station 5 Ada is listed with public access, and its status is available.
Where is Tozer Station 5 Ada?
Tozer Station 5 Ada is at 30 Tozer Rd, Beverly, MA 01915. Its coordinates are 42.57327, -70.88343.
More EV charging around Beverly
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 181901, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Tozer Station 5 Ada, Beverly, MA (AFDC station 181901)”, https://chargecensus.com/stations/massachusetts/tozer-station-5-ada-181901 (data as of October 12, 2026).