ChargeCensus

Townofsutton1 Station 2

Available

EV charging station in Sutton, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 203135.

At a glance

Townofsutton1 Station 2 is a public EV charging station at 372 Boston Rd in Sutton, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Dec 29, 2021.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID203135
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateDec 29, 2021
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
372 Boston Rd
City
Sutton
ZIP
01590
Coordinates
42.14457, -71.77223

Within ~15 km

Nearby charging

What kind of charging does Townofsutton1 Station 2 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Townofsutton1 Station 2 compare with other stations in Sutton?

Sutton has 3 charging stations in the DOE registry with 10 ports. Townofsutton1 Station 2 accounts for 20% of the charging ports in Sutton. ChargePoint runs 2 stations in Sutton. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Townofsutton1 Station 2?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Dec 29, 2021, one of 933 stations in Massachusetts with a 2021 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Townofsutton1 Station 2 have?

Townofsutton1 Station 2 has 2 charging ports: 2 Level 2.

Does Townofsutton1 Station 2 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Townofsutton1 Station 2 have?

Townofsutton1 Station 2 has J1772 connectors.

Is Townofsutton1 Station 2 open to the public?

Yes. Townofsutton1 Station 2 is listed with public access, and its status is available.

Where is Townofsutton1 Station 2?

Townofsutton1 Station 2 is at 372 Boston Rd, Sutton, MA 01590. Its coordinates are 42.14457, -71.77223.

More EV charging around Sutton

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 203135, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Townofsutton1 Station 2, Sutton, MA (AFDC station 203135)”, https://chargecensus.com/stations/massachusetts/townofsutton1-station-2-203135 (data as of October 12, 2026).