Town Of Dedham Ps #1
AvailableEV charging station in Dedham, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 319687.
At a glance
Town Of Dedham Ps #1 is a public EV charging station at 26 Bryant St Public Safety Building Front Lot in Dedham, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 14, 2023.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 319687 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Nov 14, 2023 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 26 Bryant St Public Safety Building Front Lot
- City
- Dedham
- State
- Massachusetts
- ZIP
- 02026
- Coordinates
- 42.24634, -71.17341
Within ~15 km
Nearby charging
- The Proof64 ports
Loop · Available
- Encore Boston Harbor62 ports
Loop · Available
- Encore Boston Harbor Private43 ports
Loop · Available
Tesla Destination · Available
- MGH Charlestown 199 Garage32 ports
Non-networked · Available
- Thayer Associates30 ports
Loop · Available
What kind of charging does Town Of Dedham Ps #1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Town Of Dedham Ps #1 compare with other stations in Dedham?
Dedham has 11 charging stations in the DOE registry with 38 ports. Town Of Dedham Ps #1 accounts for 5% of the charging ports in Dedham. ChargePoint runs 7 stations in Dedham. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Town Of Dedham Ps #1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 14, 2023, one of 633 stations in Massachusetts with a 2023 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Town Of Dedham Ps #1 have?
Town Of Dedham Ps #1 has 2 charging ports: 2 Level 2.
Does Town Of Dedham Ps #1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Town Of Dedham Ps #1 have?
Town Of Dedham Ps #1 has J1772 connectors.
Is Town Of Dedham Ps #1 open to the public?
Yes. Town Of Dedham Ps #1 is listed with public access, and its status is available.
Where is Town Of Dedham Ps #1?
Town Of Dedham Ps #1 is at 26 Bryant St Public Safety Building Front Lot, Dedham, MA 02026. Its coordinates are 42.24634, -71.17341.
More EV charging around Dedham
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 319687, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Town Of Dedham Ps #1, Dedham, MA (AFDC station 319687)”, https://chargecensus.com/stations/massachusetts/town-of-dedham-ps-1-319687 (data as of October 12, 2026).