Town Of Dalton Dalton Cra 2
AvailableEV charging station in Dalton, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 371533.
At a glance
Town Of Dalton Dalton Cra 2 is a public EV charging station at 400 Main Street in Dalton, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 19, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 371533 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Nov 19, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 400 Main Street
- City
- Dalton
- State
- Massachusetts
- ZIP
- 01226
- Coordinates
- 42.47247, -73.17278
Within ~15 km
Nearby charging
- Lanesborough Elementary School10 ports
FLO · Available
AmpUp · Available
Tesla Supercharger · Available
- Haddad Toyota Lenox4 ports
EV Connect · Available
- Element Lenox Berkshires4 ports
Non-networked · Available
- Element - Lenox4 ports
Quickcharge · Available
What kind of charging does Town Of Dalton Dalton Cra 2 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Town Of Dalton Dalton Cra 2 compare with other stations in Dalton?
Dalton has 9 charging stations in the DOE registry with 18 ports. Town Of Dalton Dalton Cra 2 accounts for 11% of the charging ports in Dalton. ChargePoint runs 7 stations in Dalton. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Town Of Dalton Dalton Cra 2?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 19, 2024, one of 833 stations in Massachusetts with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Town Of Dalton Dalton Cra 2 have?
Town Of Dalton Dalton Cra 2 has 2 charging ports: 2 Level 2.
Does Town Of Dalton Dalton Cra 2 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Town Of Dalton Dalton Cra 2 have?
Town Of Dalton Dalton Cra 2 has J1772 connectors.
Is Town Of Dalton Dalton Cra 2 open to the public?
Yes. Town Of Dalton Dalton Cra 2 is listed with public access, and its status is available.
Where is Town Of Dalton Dalton Cra 2?
Town Of Dalton Dalton Cra 2 is at 400 Main Street, Dalton, MA 01226. Its coordinates are 42.47247, -73.17278.
More EV charging around Dalton
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 371533, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Town Of Dalton Dalton Cra 2, Dalton, MA (AFDC station 371533)”, https://chargecensus.com/stations/massachusetts/town-of-dalton-dalton-cra-2-371533 (data as of October 12, 2026).