ChargeCensus

Town Of Andover Municipal Lot 3

Available

EV charging station in Andover, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 331920.

At a glance

Town Of Andover Municipal Lot 3 is a public EV charging station at 2 Bartlet St in Andover, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Apr 9, 2024.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID331920
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateApr 9, 2024
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
2 Bartlet St
ZIP
01810
Coordinates
42.65678, -71.13849

Within ~15 km

Nearby charging

What kind of charging does Town Of Andover Municipal Lot 3 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does Town Of Andover Municipal Lot 3 compare with other stations in Andover?

Andover has 27 charging stations in the DOE registry with 59 ports. Town Of Andover Municipal Lot 3 accounts for 3% of the charging ports in Andover. ChargePoint runs 24 stations in Andover. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates Town Of Andover Municipal Lot 3?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Apr 9, 2024, one of 833 stations in Massachusetts with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does Town Of Andover Municipal Lot 3 have?

Town Of Andover Municipal Lot 3 has 2 charging ports: 2 Level 2.

Does Town Of Andover Municipal Lot 3 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does Town Of Andover Municipal Lot 3 have?

Town Of Andover Municipal Lot 3 has J1772 connectors.

Is Town Of Andover Municipal Lot 3 open to the public?

Yes. Town Of Andover Municipal Lot 3 is listed with public access, and its status is available.

Where is Town Of Andover Municipal Lot 3?

Town Of Andover Municipal Lot 3 is at 2 Bartlet St, Andover, MA 01810. Its coordinates are 42.65678, -71.13849.

More EV charging around Andover

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 331920, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “Town Of Andover Municipal Lot 3, Andover, MA (AFDC station 331920)”, https://chargecensus.com/stations/massachusetts/town-of-andover-municipal-lot-3-331920 (data as of October 12, 2026).