Town Ctr Lot E Station 1
AvailableEV charging station in Peabody, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 371448.
At a glance
Town Ctr Lot E Station 1 is a public EV charging station at 100 Brooksby Village Dr in Peabody, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Nov 16, 2024.
Station record
DOE registry record
| Field | Value |
|---|---|
| AFDC station ID | 371448 |
| Network | ChargePoint |
| Status | Available (E) |
| Access | Public |
| Open date | Nov 16, 2024 |
| Last updated at source | Oct 12, 2026 |
Plugs
Connectors & pricing
- J1772 — The standard Level 1/2 AC connector.
Pricing: not listed in the DOE registry.
Location
- Address
- 100 Brooksby Village Dr
- City
- Peabody
- State
- Massachusetts
- ZIP
- 01960
- Coordinates
- 42.55012, -70.97077
Within ~15 km
Nearby charging
- Cummings Center30 ports
Non-networked · Available
- Medford, MA - Tesla Supercharger16 ports
Tesla Supercharger · Available
- Town of Middleton - town Hall14 ports
OpConnect · Available
FLO · Available
Tesla Supercharger · Available
Tesla Supercharger · Available
What kind of charging does Town Ctr Lot E Station 1 offer?
Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.
How does Town Ctr Lot E Station 1 compare with other stations in Peabody?
Peabody has 11 charging stations in the DOE registry with 32 ports. Town Ctr Lot E Station 1 accounts for 6% of the charging ports in Peabody. ChargePoint runs 8 stations in Peabody. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.
Who operates Town Ctr Lot E Station 1?
The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.
What does the “Available” status mean?
“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Nov 16, 2024, one of 833 stations in Massachusetts with a 2024 open date. The station's record was last updated at the source on Oct 12, 2026.
Frequently asked questions
How many chargers does Town Ctr Lot E Station 1 have?
Town Ctr Lot E Station 1 has 2 charging ports: 2 Level 2.
Does Town Ctr Lot E Station 1 have DC fast charging?
No. The registry lists no DC fast ports here; its 2 ports are all Level 2.
What connectors does Town Ctr Lot E Station 1 have?
Town Ctr Lot E Station 1 has J1772 connectors.
Is Town Ctr Lot E Station 1 open to the public?
Yes. Town Ctr Lot E Station 1 is listed with public access, and its status is available.
Where is Town Ctr Lot E Station 1?
Town Ctr Lot E Station 1 is at 100 Brooksby Village Dr, Peabody, MA 01960. Its coordinates are 42.55012, -70.97077.
More EV charging around Peabody
Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
Dataset updated . Source: US DOE Alternative Fuels Data Center station 371448, weekly full pull.
About this data
Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.
Cite as: ChargeCensus, “Town Ctr Lot E Station 1, Peabody, MA (AFDC station 371448)”, https://chargecensus.com/stations/massachusetts/town-ctr-lot-e-station-1-371448 (data as of October 12, 2026).