ChargeCensus

The Center Station 1

Available

EV charging station in Burlington, Massachusetts on the ChargePoint network — 2 Level 2. US DOE AFDC station 161978.

At a glance

The Center Station 1 is a public EV charging station at 25 Corporate Dr in Burlington, Massachusetts, on the ChargePoint network. It has 2 charging ports (2 Level 2) with J1772 connectors. The US DOE registry lists it as available, open since Jun 12, 2020.

Total ports
2
DC fast
0
Level 2
2
Access
Public
◆ Loading map…
≥ 50 ports20–508–20< 8 ports
This entry + 6 nearby

Station record

DOE registry record

FieldValue
AFDC station ID161978
NetworkChargePoint
StatusAvailable (E)
AccessPublic
Open dateJun 12, 2020
Last updated at sourceOct 12, 2026

Plugs

Connectors & pricing

  • J1772 — The standard Level 1/2 AC connector.

Pricing: not listed in the DOE registry.

Charging network

ChargePoint

Operates 48,998 stations in the DOE registry — view the full network →

Location

Address
25 Corporate Dr
ZIP
01803
Coordinates
42.49482, -71.18958

Within ~15 km

Nearby charging

What kind of charging does The Center Station 1 offer?

Of its 2 ports, 2 are Level 2. Level 2 ports are 240-volt AC chargers, typically used where a car is parked for an hour or more. That is about 24% below the Massachusetts average of 2.6 ports per station. The registry lists one connector type: J1772, the standard Level 1/2 AC connector.

How does The Center Station 1 compare with other stations in Burlington?

Burlington has 48 charging stations in the DOE registry with 116 ports, the 14th-most of 331 cities and towns in Massachusetts. The Center Station 1 accounts for 2% of the charging ports in Burlington. ChargePoint runs 41 stations in Burlington. Statewide, Massachusetts has 4,921 stations and 13,009 ports, the 3rd-largest station count of the 51 states and DC. The biggest station in Massachusetts, Avalon Quincy Adams in Quincy, has 83 ports.

Who operates The Center Station 1?

The largest US charging network by station count — mostly Level 2 at workplaces, retail and municipal sites. ChargePoint operates 48,998 stations in the registry across 52 states, with 5,017 DC fast and 83,427 Level 2 ports in total. 3,740 of those stations are in Massachusetts, 76% of the state's 4,921.

What does the “Available” status mean?

“Available” means the station is open and in service according to the DOE registry. Its access code is public, meaning it is listed as open to any driver. It opened on Jun 12, 2020, one of 314 stations in Massachusetts with a 2020 open date. The station's record was last updated at the source on Oct 12, 2026.

Frequently asked questions

How many chargers does The Center Station 1 have?

The Center Station 1 has 2 charging ports: 2 Level 2.

Does The Center Station 1 have DC fast charging?

No. The registry lists no DC fast ports here; its 2 ports are all Level 2.

What connectors does The Center Station 1 have?

The Center Station 1 has J1772 connectors.

Is The Center Station 1 open to the public?

Yes. The Center Station 1 is listed with public access, and its status is available.

Where is The Center Station 1?

The Center Station 1 is at 25 Corporate Dr, Burlington, MA 01803. Its coordinates are 42.49482, -71.18958.

More EV charging around Burlington

Working with Massachusetts charging stations? Pro adds alerts, change history and CSV export ($29/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

Dataset updated . Source: US DOE Alternative Fuels Data Center station 161978, weekly full pull.

About this data

Source: US Department of Energy Alternative Fuels Data Center (AFDC) station registry, as published October 12, 2026 — ChargeCensus refreshes it weekly. See the methodology for how records are matched, cleaned and scored.

Cite as: ChargeCensus, “The Center Station 1, Burlington, MA (AFDC station 161978)”, https://chargecensus.com/stations/massachusetts/the-center-station-1-161978 (data as of October 12, 2026).